Skip to content
PlanIndex Get alerts
Menu

Planning application

Timberley Academy Bradley Road Shard End Birmingham B34 7RL

Granted Birmingham 2023/06752/PA Full Planning

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Retention of single storey Portakabin building for use as a stay and play community facility for a temporary period of five years

As published by the council, reference 2023/06752/PA

Application record

Reference
2023/06752/PA
Type
Full Planning
Status
Conditions
Decision
Approve Temporary
Received
6 Oct 2023
Validated
17 Oct 2023
Decided
28 Mar 2024
Ward
Shard End
Postcode
B34 7RL

Timeline

Dates from the published record

  1. 6 Oct 2023

    Received by Birmingham

  2. 17 Oct 2023

    Validated

    Checked as complete and ready for consideration.

  3. 28 Mar 2024

    Decision issued: Approve Temporary

  4. 3 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 134 Timberley Lane, Birmingham, B34 7EP

    2026/02360/PA Submitted 24 Apr 2026 94m away

    Application for lawful development certificate for proposed loft conversion including a dormer window to the rear

    Decided Lawful development Loft or dormer Windows or glazing 7 docs
  • 154 Timberley Lane, Birmingham, B34 7EP

    2026/03796/PA Submitted 8 Jul 2026 155m away

    87% historically approved · decision due ~8 Oct

    Erection of single storey rear and first floor rear extensions and garage conversion to habitable room

    Awaiting decision Householder Extension 5 docs
    Small domestic
  • Near 28 Alderpits Road Shard End Birmingham B34 7RR

    2021/02613/PA Submitted 22 Mar 2021 168m away

    Telecoms Licence Advisory application for the installation of 1 x 9m wooden pole

    Decided Telecoms 1 doc
  • 59 Bradley Road Birmingham B34 7RJ

    2026/00728/PA Submitted 10 Feb 2026 178m away

    Erection of 4.2 metre deep single storey rear extension. Maximum height 3 metres, eaves height 3 metres

    Granted Prior approval Extension 4 docs
    Small domestic
  • 12 Alderpits Road Shard End Birmingham B34 7RR

    2026/01031/PA Submitted 25 Feb 2026 179m away

    Application for a Lawful Development Certificate for a proposed loft conversion with flat roof dormer and roof light to front.

    Decided Lawful development Loft or dormer 5 docs
  • 12 Alderpits Road Birmingham B34 7RR

    2026/01030/PA Submitted 25 Feb 2026 179m away

    Erection of single storey rear extension and forward porch extension to front

    Refused Householder Extension 7 docs
    Small domestic

In Birmingham

  • 2026/02132/PA Granted

    Outside 1690 Bristol Road Rednal Birmingham B45 9TZ

    Installation of 1no. BT street hub unit

    21 Apr 2026 Full applications
  • 2026/02004/PA Granted

    311 Fox Hollies Road Acocks Green Olton Birmingham B27 7PS

    Erection of single storey flat roof rear extension and rear dormer window to form additional bedrooms

    15 Apr 2026 Full applications
  • 2026/03109/PA Granted

    Wickes Tameside Business Park Aldridge Road Birmingham Perry Barr B42 2ET

    Alterations to existing shopfront comprising new glazing and associated works.

    12 Jun 2026 Full applications
  • 2025/05763/PA Granted

    land adj to 142 Melton Road Kings Heath Birmingham B14 7ES

    Demolition of existing structures/buildings and change of use from builders yard (sui generis) to domestic curtilage (Use Class C3) of no. 142 Melton Road along with associated works (erection of boundary treatment and gate)

    10 Oct 2025 Full applications
  • 2025/05722/PA Granted

    724A Yardley Wood Road Billesley Birmingham B13 0HY

    Installation of new extraction flue, air roof cowl and extract grilles to rear.

    9 Oct 2025 Full applications