Skip to content
PlanIndex Get alerts
Menu

Planning application

12 Cheston Road Aston Birmingham B7 5EH

Refused Birmingham 2023/06598/PA Full Planning

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.

Proposal

Retention of single storey side extension

As published by the council, reference 2023/06598/PA

Application record

Reference
2023/06598/PA
Type
Full Planning
Status
Rejected
Decision
Refuse
Received
29 Sep 2023
Validated
27 Oct 2023
Decided
15 Dec 2023
Ward
Nechells
Postcode
B7 5EH

Timeline

Dates from the published record

  1. 29 Sep 2023

    Received by Birmingham

  2. 27 Oct 2023

    Validated

    Checked as complete and ready for consideration.

  3. 15 Dec 2023

    Decision issued: Refuse

  4. 3 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Birmingham

  • 2026/02132/PA Granted

    Outside 1690 Bristol Road Rednal Birmingham B45 9TZ

    Installation of 1no. BT street hub unit

    21 Apr 2026 Full applications
  • 2026/02004/PA Granted

    311 Fox Hollies Road Acocks Green Olton Birmingham B27 7PS

    Erection of single storey flat roof rear extension and rear dormer window to form additional bedrooms

    15 Apr 2026 Full applications
  • 2026/03109/PA Granted

    Wickes Tameside Business Park Aldridge Road Birmingham Perry Barr B42 2ET

    Alterations to existing shopfront comprising new glazing and associated works.

    12 Jun 2026 Full applications
  • 2025/05763/PA Granted

    land adj to 142 Melton Road Kings Heath Birmingham B14 7ES

    Demolition of existing structures/buildings and change of use from builders yard (sui generis) to domestic curtilage (Use Class C3) of no. 142 Melton Road along with associated works (erection of boundary treatment and gate)

    10 Oct 2025 Full applications
  • 2025/05722/PA Granted

    724A Yardley Wood Road Billesley Birmingham B13 0HY

    Installation of new extraction flue, air roof cowl and extract grilles to rear.

    9 Oct 2025 Full applications