Skip to content
PlanIndex Get alerts
Menu

Planning application

461 Shenley Lane Selly Oak Birmingham B29 4JD

Granted Birmingham 2023/04151/PA Permitted Development Householder

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of 4.5 metre deep single storey rear extension. Maximum height 2.8 metres. Eaves height 2.8 metres.

As published by the council, reference 2023/04151/PA

Application record

Reference
2023/04151/PA
Type
Permitted Development Householder
Status
Permitted
Decision
Insufficient Information - Prior Approval criteria not met
Received
19 Jun 2023
Validated
23 Jun 2023
Decided
27 Jul 2023
Ward
Allens Cross
Postcode
B29 4JD

Timeline

Dates from the published record

  1. 19 Jun 2023

    Received by Birmingham

  2. 23 Jun 2023

    Validated

    Checked as complete and ready for consideration.

  3. 27 Jul 2023

    Decision issued: Insufficient Information - Prior Approval criteria not met

  4. 3 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About prior approval applications

How this application type works

Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.

More on prior approval applications in our guide

Nearby applications

Within 500 metres

  • Shenley Playing Fileds Shenley Lane Birmingham B29

    2026/03809/PA Submitted 8 Jul 2026 70m away

    Application for a prior notification for the installation of 22.5m high telecommunications mast with associated antennas, transmission dishes, equipment cabinets and ancillary development works

    Refused Telecoms 8 docs
  • Senneleys Park Senneleys Park Road Birmingham B31 1AG

    2026/03822/PA Submitted 6 Jul 2026 126m away

    96% historically approved · decision due ~5 Oct

    Application to determine the details of condition numbers 8 (Landscaping), 10 (Boundary treatments), 11 (Construction Method Statement), 12 (External materials), 13 (Tree protection), 17 (Precautionary Working Method Statement), 18 (Landscape Ecological Management Plan), 19 (Lighting assessment), 20 (BNG credits) and 21 (Landscaping and BNG calculations) attached to planning application 2025/01600/PA

    Awaiting decision Conditions Trees 19 docs
  • Sports Ground Shenley Lane Weoley Birmingham B29 4HZ

    2026/03434/PA Submitted 22 Jun 2026 126m away

    71% historically approved · decision due ~25 Sep

    Installation of a new floodlighting system consisting of 20no LED floodlights fitted to 8no. new 15m columns

    Awaiting decision Full applications 200 docs
  • 36 Meadow Brook Road Northfield Birmingham B31 1NE

    2023/05287/PA Submitted 3 Aug 2023 129m away

    Retention of canopy roof above bay window

    Granted Householder Windows or glazing 6 docs
    Domestic
  • Outside 1 Meadow Brook Road Northfield Birmingham B31 1NE

    2024/03699/PA Submitted 3 Jun 2024 129m away

    Telecoms License Advisory for the installation of fixed line broadband electronic communications apparatus

    Decided Telecoms 1 doc
  • Longwill Special School Bell Hill Northfield Birmingham B31 1LD

    2024/01855/PA Submitted 25 Mar 2024 231m away

    Installation of external lift with associated works

    Granted Full applications 5 docs

In Birmingham

  • 2026/04402/PA Granted

    69 Dads Lane, Birmingham, B13 8PG

    Erection of 5 metre deep single storey rear extension. Maximum height 3.7 metres, eaves height 2.7 metres

    22 Jul 2026 Prior approval
  • 2026/04343/PA Granted

    45 Horse Shoes Lane, Birmingham, B26 3HS

    Erection of 6 metre deep single storey rear extension. Maximum height 3.9 metres, eaves height 2.8 metres

    15 Jul 2026 Prior approval
  • 2026/05415/PA Awaiting decision

    90 Hoggs Lane, Birmingham, B31 1SR

    Erection of 5.07 metre deep single storey rear extension. Maximum height 3 metres, eaves height 3 metres

    2 Sep 2026 Prior approval
  • 2026/05432/PA Awaiting decision

    35 Albert Road, Birmingham, B21 9LA

    Erection of 6 metre deep single storey rear extension. Maximum height 3 metres, eaves height 2.6 metres

    2 Sep 2026 Prior approval
  • 2026/04564/PA Granted

    307 Streetly Road, Birmingham, B23 5JN

    Erection of 6 metre deep single storey rear extension. Maximum height 3 metres, eaves height 3 metres

    31 Jul 2026 Prior approval