Planning application
Aston Church Road Overbridge Over Network Rail infrastructure between areas of Nechells and Saltley
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Request for Plans and Specifications approval for an overbridge structure carrying Aston Church Road over existing and proposed rail infrastructure with associated earthworks, bridge lighting and vehicle restraint system submitted under Schedule 17 of the High-Speed Rail (London-West Midlands) Act 2017 including Supplementary Environmental Statement for temporary closures of Aston Church Road.
As published by the council, reference 2023/00419/PA
Application record
- Reference
- 2023/00419/PA
- Type
- High Speed Rail (London to West Midlands) Act 2017
- Status
- Conditions
- Decision
- Granted As published: Approve subject to Conditions
- Received
- 19 Jan 2023
- Validated
- 24 Jan 2023
- Decided
- 1 Sep 2023
- Ward
- Nechells
Site history
Applications at this address on the Birmingham register
This site has had 2 applications since 2023: 2 approved, 0 refused.
-
2024/07908/PA Granted
Aston Church Road Overbridge Over Network Rail infrastructure between areas of Nechells and Saltley
Discharge of conditions 2 (parapet details and sample materials), 3 (details and samples of street lighting on the bridge), 4 (details and sample of pedestrian handrail) and 5 (details of hard landscape) and 6 (details of earthworks) pursuant to application reference 2023/00419/PA for an overbridge structure carrying Aston Church Road over existing and proposed rail infrastructure with associated earthworks, bridge lighting and vehicle restraint system submitted under Schedule 17 of the High-Speed Rail (London-West Midlands) Act 2017 including Supplementary Environmental Statement for temporary closures of Aston Church Road.
Timeline
Dates from the published record
-
19 Jan 2023
Received by Birmingham
-
24 Jan 2023
Validated
Checked as complete and ready for consideration.
-
1 Sep 2023
Decision issued: Approve subject to Conditions
-
17 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
53 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Birmingham granted permission on 1 September 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About prior approval applications
Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.
Other prior approval applications
In Birmingham
-
2026/04898/PA Awaiting decision
144 Addison Road, Birmingham, B14 7EP
Erection of 5 metre deep single storey rear extension. Maximum height 3 metres, eaves height 2.8 metres
-
2026/05834/PA Awaiting decision
84 Falcon Lodge Crescent, Birmingham, B75 7LU
Erection of 4 metre deep single storey rear extension. Maximum height 3.8 metres, eaves height 2.7 metres
-
2026/05833/PA Awaiting decision
126 Trittiford Road, Birmingham, B13 0HD
Erection of 6 metre deep single storey rear extension. Maximum height 3.2 metres, eaves height 2.55 metres
-
2026/04870/PA Awaiting decision
246 Tennal Road, Birmingham, B32 2HJ
Erection of 5.3 metre deep single storey rear extension. Maximum height 3.2 metres, eaves height 3 metres
-
2026/05824/PA Awaiting decision
land rear of 76 - 78 Yardley Road Birmingham B27 6LG
Application to determine if prior approval is required for a proposed change of use of part of the building from Commercial, Business & Service (Use Class E) to 1 no. dwellinghouse (Use Class C3)