Skip to content
PlanIndex Get alerts
Menu

Planning application

148 High Street Harborne Birmingham B17 9PN

Granted Birmingham 2022/08653/PA Full Planning

Works: Loft or dormer Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of 4no. new windows and 1no. smoke vent and replacement of all existing windows on ground, first and second floors and 4no. rooflights

As published by the council, reference 2022/08653/PA

Application record

Reference
2022/08653/PA
Type
Full Planning
Status
Decided: APPROVE SUBJECT TO CONDITIONS
Decision
APPROVE SUBJECT TO CONDITIONS
Received
22 Nov 2022
Validated
12 Dec 2022
Decided
11 Jan 2023
Ward
Harborne
Postcode
B17 9PN

Timeline

Dates from the published record

  1. 22 Nov 2022

    Received by Birmingham

  2. 12 Dec 2022

    Validated

    Checked as complete and ready for consideration.

  3. 11 Jan 2023

    Decision issued: APPROVE SUBJECT TO CONDITIONS

  4. 3 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 148 High Street Harborne Birmingham B17 9PN

    2022/08658/PA Submitted 21 Nov 2022 0m away

    Prior Approval for change of use of the first and second floors from Commercial, Business & Service (Use Class E) to 4 apartments (Use Class C3).

    Granted Prior approval New dwelling 11 docs
    Several homes
  • 148 High Street Harborne Birmingham B17 9PN

    2023/01778/PA Submitted 17 Mar 2023 0m away

    Sub-division of existing single unit into 2no. units, formation of new entrance and installation roller shutters

    Withdrawn Full applications 9 docs
    Several homes
  • 156 High Street Harborne Birmingham B17 9PN

    2024/03644/PA Submitted 7 Jun 2024 13m away

    Change of use from retail shop (Use Class E) to restaurant/hot food takeaway (Use Class E/Sui-Generis) and installation of replacement shopfront and extraction flue to rear

    Refused Full applications Windows or glazing 6 docs
  • 156 High Street Harborne Birmingham B17 9PN

    2021/01433/PA Submitted 19 Feb 2021 21m away

    Erection of single storey rear extension and retention of dormer window

    Granted Full applications Extension Loft or dormer +1 8 docs
    Small domestic
  • 131 High Street Harborne Birmingham B17 9NP

    2022/07654/PA Submitted 11 Oct 2022 42m away

    Erection of single storey rear extension

    Granted Full applications Extension 7 docs
    Small domestic
  • 136 High Street Harborne Birmingham B17 9NN

    2022/07817/PA Submitted 18 Oct 2022 47m away

    Display of 1no. internally illuminated fascia sign, 1no. internally illuminated projecting sign and 1no. other non illuminated sign

    Granted Advertising 8 docs

In Birmingham

  • 2026/02132/PA Granted

    Outside 1690 Bristol Road Rednal Birmingham B45 9TZ

    Installation of 1no. BT street hub unit

    21 Apr 2026 Full applications
  • 2026/02004/PA Granted

    311 Fox Hollies Road Acocks Green Olton Birmingham B27 7PS

    Erection of single storey flat roof rear extension and rear dormer window to form additional bedrooms

    15 Apr 2026 Full applications
  • 2026/03109/PA Granted

    Wickes Tameside Business Park Aldridge Road Birmingham Perry Barr B42 2ET

    Alterations to existing shopfront comprising new glazing and associated works.

    12 Jun 2026 Full applications
  • 2025/05763/PA Granted

    land adj to 142 Melton Road Kings Heath Birmingham B14 7ES

    Demolition of existing structures/buildings and change of use from builders yard (sui generis) to domestic curtilage (Use Class C3) of no. 142 Melton Road along with associated works (erection of boundary treatment and gate)

    10 Oct 2025 Full applications
  • 2025/05722/PA Granted

    724A Yardley Wood Road Billesley Birmingham B13 0HY

    Installation of new extraction flue, air roof cowl and extract grilles to rear.

    9 Oct 2025 Full applications