Planning application
1944 Coventry Road, Birmingham, B26 3HH
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of 4 metre deep single storey rear extension. Maximum height 3.1 metres. Eaves height 3.1 metres
As published by the council, reference 2022/08181/PA
Application record
- Reference
- 2022/08181/PA
- Type
- Permitted Development Householder
- Status
- Granted As published: Decided: OUT OF SCOPE - PRIOR APPROVAL CRITERIA NOT MET
- Decision
- Granted As published: OUT OF SCOPE - PRIOR APPROVAL CRITERIA NOT MET
- Received
- 31 Oct 2022
- Validated
- 8 Nov 2022
- Decided
- 14 Dec 2022
- Ward
- Sheldon
- Postcode
- B26 3HH
Site history
Applications at this address on the Birmingham register
This site has had 3 applications since 2022: 2 approved, 1 refused.
-
2025/06967/PA Granted
1944 Coventry Road Birmingham B26 3HH
Erection of 4.2 metre deep single storey rear extension. Maximum height 4 metres, eaves height 3 metres
-
2022/05762/PA Refused
1944 Coventry Road Birmingham B26 3HH
Erection of 5 metre deep single storey rear extension. Maximum height 3 metres. Eaves height 3 metres
Timeline
Dates from the published record
-
31 Oct 2022
Received by Birmingham
-
8 Nov 2022
Validated
Checked as complete and ready for consideration.
-
14 Dec 2022
Decision issued: OUT OF SCOPE - PRIOR APPROVAL CRITERIA NOT MET
-
29 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Birmingham granted permission on 14 December 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About prior approval applications
Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
28 Beechmore Road Sheldon Birmingham B26 3AR
Erection of single storey side and rear extension and alterations to existing single storey rear extension including installation of pitched roof and ground floor door.
Granted Householder Extension 8 docsSmall domestic -
55 Beechmore Road Sheldon Birmingham B26 3AR
Erection of single storey rear extension
Withdrawn Householder Extension 7 docsSmall domestic -
1944 Coventry Road Birmingham B26 3HH
Erection of 4.2 metre deep single storey rear extension. Maximum height 4 metres, eaves height 3 metres
Granted Prior approval Extension 3 docsSmall domestic -
1944 Coventry Road Birmingham B26 3HH
Erection of 5 metre deep single storey rear extension. Maximum height 3 metres. Eaves height 3 metres
Refused Prior approval Extension 4 docsSmall domestic -
33 Beechmore Road, Birmingham, B26 3AR
71% historically approved · decision due ~5 Nov
Change of use from HMO (Sui Generis) to children's care home (Use Class C2)
Awaiting decision Full applications 10 docs -
Whirlwind Service Station New Coventry Road Birmingham Sheldon B26 3HL
Application to determine the details for condition number 4 (submission of extraction and odour control details) attached to reference number 2023/07946/PA
Granted Conditions 7 docs
Other prior approval applications
In Birmingham
-
2026/06224/PA Awaiting decision
29 The Grove, Birmingham, B31 3JX
Erection of 4 metre deep single storey rear extension. Maximum height 3.8 metres, eaves height 2.65 metres
-
2026/06212/PA Awaiting decision
137 Hodge Hill Road, Birmingham, B34 6DY
Erection of 6 metre deep single storey rear extension. Maximum height 3.8 metres, eaves height 2.8 metres
-
2026/05112/PA Granted
83 Fox Green Crescent, Birmingham, B27 7SG
Erection of 5 metre deep single storey rear extension. Maximum height 3.9 metres, eaves height 3 metres
-
2026/05062/PA Granted
10 Brewers Square, Birmingham, B16 0PN
Erection of 3.5 metre deep single storey rear extension. Maximum height 4 metres, eaves height 3 metres
-
2026/04891/PA Granted
95 Millhouse Road, Birmingham, B25 8QT
Erection of 4 metre deep single storey rear extension. Maximum height 3.8 metres, eaves height 2.7 metres