Skip to content
PlanIndex Get alerts
Menu

Planning application

2022/07977/PA

65 Church Street, Birmingham, B3 2DP

Granted Birmingham Permitted Development Commercial from May 2013

Proposal

Prior Approval for change of use from Commercial, Business & Service (Use Class E) to 15 apartments (Use Class C3)

As published by the council, reference 2022/07977/PA

Timeline

Dates from the published record

  1. 24 Oct 2022

    Received by Birmingham

  2. 25 Oct 2022

    Validated

    Checked as complete and ready for consideration.

  3. 19 Dec 2022

    Decision issued: PRIOR APPROVAL REQUIRED AND TO APPROVE WITH CONDITIONS

  4. 27 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About prior approval applications

How this application type works

Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.

More on prior approval applications in our guide

Nearby applications

Within 500 metres

  • 2025/06679/PA Granted

    35 Ground Floor Livery Street Birmingham B3 2PB

    Display of 3no. illuminated fascia signs

    25 Nov 2025 65m away Advertising
  • 2025/06654/PA Granted

    35 Ground Floor Livery Street Birmingham B3 2PB

    Application for proposed changes to existing window bays, removal of existing entrance on north-east elevation, new accessible entrance on Livery Street, existing accessible entrance on north-west elevation modified. New underpass overhead lighting installation

    25 Nov 2025 65m away Full applications
  • 2026/02339/PA Status unknown

    61 Newhall Street Birmingham B3 3RB

    Application to amend the dates of previously granted consent under planning application 2025/02567/PA to display externally illuminated scaffold.

    29 Apr 2026 141m away Advertising
  • 2026/02078/PA Awaiting decision

    151-165 Royal & Sunalliance Edmund Street Birmingham B3 2TA

    Installation of 2 no. metal grilles in external wall to provide inlet and extract points for a fresh air ventilation system to be installed to the fourth floor office area

    20 Apr 2026 149m away Full applications
  • 2026/01926/PA Status unknown

    Land at Upper Trinity Street and Adderley Street Digbeth Birmingham B3 2TA

    Application to determine the details for condition number (24 Submission of a Contaminated Land Verification Report) attached to reference number 2023/02759/PA (as amended by 2024/00360/PA)

    13 Apr 2026 149m away Conditions
  • 2025/06418/PA Granted

    35 Newhall Street Birmingham B3 3PU

    Application to determine the details for condition number 3 (Sound Insulation for Plant/Machinery) attached to reference number 2023/05863/PA

    13 Nov 2025 153m away Conditions

In Birmingham

  • 2026/04472/PA Awaiting decision

    29 Lodge Road, Birmingham, B6 6LU

    Erection of 4 metre deep single storey rear extension. Maximum height 3 metres, eaves height 3 metres

    28 Jul 2026 Prior approval
  • 2026/04470/PA Awaiting decision

    222 Sommerfield Road, Birmingham, B32 3TA

    Erection of 5 metre deep single storey rear extension. Maximum height 3 metres, eaves height 2.5 metres

    28 Jul 2026 Prior approval
  • 2026/04477/PA Awaiting decision

    181 Robin Hood Lane, Birmingham, B28 0JE

    Erection of 6 metre deep single storey rear extension. Maximum height 3 metres, eaves height 2.5 metres

    28 Jul 2026 Prior approval
  • 2026/00429/PA Granted

    Former Gas Works Watson Road Birmingham

    Application for a prior notification for proposed demolition of existing buildings

    27 Jan 2026 Prior approval
  • 2026/03278/PA Granted

    125 Lyttelton Road, Birmingham, B33 8BN

    Erection of 6 metre deep single storey rear extension. Maximum height 4 metres, eaves height 3 metres

    15 Jun 2026 Prior approval