Skip to content
PlanIndex Get alerts
Menu

Planning application

501 Slade Road Stockland Green Birmingham B23 7JG

Granted Birmingham 2021/02515/PA Full Planning

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of single storey rear extension and associated works.

As published by the council, reference 2021/02515/PA

Application record

Reference
2021/02515/PA
Type
Full Planning
Status
Decided: APPROVE SUBJECT TO CONDITIONS
Decision
APPROVE SUBJECT TO CONDITIONS
Received
22 Mar 2021
Validated
13 Apr 2021
Decided
19 May 2021
Ward
Stockland Green
Postcode
B23 7JG

Timeline

Dates from the published record

  1. 22 Mar 2021

    Received by Birmingham

  2. 13 Apr 2021

    Validated

    Checked as complete and ready for consideration.

  3. 19 May 2021

    Decision issued: APPROVE SUBJECT TO CONDITIONS

  4. 6 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 501 - 503 Sycamore Lodge Slade Road Erdington Birmingham B23 7JG

    2025/07251/PA Submitted 24 Dec 2025 0m away

    Non Material Amendment to planning application approval 2024/07957/PA for proposed additional windows, rooflights and removal of front canopies.

    Granted Amendments Loft or dormer Windows or glazing 18 docs
  • 501 - 503 Sycamore Lodge Slade Road Erdington Birmingham B23 7JG

    2025/05751/PA Submitted 10 Oct 2025 36m away

    Application to determine the details for condition number 5 and 6 (5 Requires the prior submission of details of bird/bat boxes 6 - Requires the prior submission of a precautionary working method statement) attached to reference number 2024/07957/PA

    Granted Conditions 5 docs
  • 501 - 503 Sycamore Lodge Slade Road Stockland Green Birmingham B23 7JG

    2025/07250/PA Submitted 24 Dec 2025 36m away

    Application to determine the details for condition number 3 (Submission and approval of external materials and detailing) attached to reference number 2024/07957/PA

    Granted Conditions 5 docs
  • Highcroft Hospital Slade Road Birmingham B23 7LA

    2026/02985/PA Submitted 2 Jun 2026 114m away

    96% historically approved · decision due ~7 Sep

    Application to determine the details for condition number (17- Submission of a sustainable drainage scheme) attached to reference number 2025/01896/PA

    Awaiting decision Conditions 6 docs
  • Highcroft Hospital Slade Road Birmingham B23 7LA

    2026/03134/PA Submitted 12 Jun 2026 114m away

    96% historically approved · decision due ~15 Sep

    Application to determine the details for condition number (3-Submission and approval of external materials 5-Submission of hard surfacing materials 8-Submission of details of bird/bat boxes 10-A landscape and ecological management plan (LEMP) 12- Submission and approval of a detailed planting scheme) attached to reference number 2025/01896/PA

    Awaiting decision Conditions 16 docs
  • Outside 527 Slade Road Stockland Green Birmingham B23 7JD

    2025/04285/PA Submitted 5 Aug 2025 126m away

    Installation of 1no. BT street hub unit

    Granted Full applications 10 docs

In Birmingham

  • 2026/02132/PA Granted

    Outside 1690 Bristol Road Rednal Birmingham B45 9TZ

    Installation of 1no. BT street hub unit

    21 Apr 2026 Full applications
  • 2026/02004/PA Granted

    311 Fox Hollies Road Acocks Green Olton Birmingham B27 7PS

    Erection of single storey flat roof rear extension and rear dormer window to form additional bedrooms

    15 Apr 2026 Full applications
  • 2026/03109/PA Granted

    Wickes Tameside Business Park Aldridge Road Birmingham Perry Barr B42 2ET

    Alterations to existing shopfront comprising new glazing and associated works.

    12 Jun 2026 Full applications
  • 2025/05763/PA Granted

    land adj to 142 Melton Road Kings Heath Birmingham B14 7ES

    Demolition of existing structures/buildings and change of use from builders yard (sui generis) to domestic curtilage (Use Class C3) of no. 142 Melton Road along with associated works (erection of boundary treatment and gate)

    10 Oct 2025 Full applications
  • 2025/05722/PA Granted

    724A Yardley Wood Road Billesley Birmingham B13 0HY

    Installation of new extraction flue, air roof cowl and extract grilles to rear.

    9 Oct 2025 Full applications