Skip to content
PlanIndex Get alerts
Menu

Planning application

159 - 159A Upper Wickham Lane Welling Kent DA16 3AW

Awaiting decision Bexley 26/01481/FUL Full applications

Works: Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Change of use from Offices (Class E) to 4 residential units (Class C3) and erection of 2 two-storey semi-detached dwellings with accommodation at roof level to rear along with landscaping and associated works following demolition of existing outbuildings.

As published by the council, reference 26/01481/FUL

Application record

Reference
26/01481/FUL
Category
Full applications
Status
With Case Officer
Received
28 Jul 2026
Validated
30 Jul 2026
Postcode
DA16 3AW

Timeline

Dates from the published record

  1. 28 Jul 2026

    Received by Bexley

  2. 30 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 10 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 24 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Bexley took a median of 56 days over the applications it decided in the last year.

What happens while it is decided

The process from here

This application is with Bexley for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 211 Upper Wickham Lane Welling Kent DA16 3AW

    26/00655/FUL Submitted 1 Apr 2026 0m away

    91% historically approved · decision due ~3 Aug

    Erection of a part one/part two storey side and rear extension following demolition of existing garage.

    Awaiting decision Full applications Extension Demolition
  • 173 Upper Wickham Lane Welling Kent DA16 3AW

    26/01288/FUL Submitted 2 Jul 2026 0m away

    91% historically approved · decision due ~28 Aug

    Retrospective application to retain a single storey rear extension and proposed separation from existing rear addition.

    Awaiting decision Full applications Extension
    Small domestic
  • 159 Upper Wickham Lane Welling Kent DA16 3AW

    26/00304/FUL01 Submitted 1 Jul 2026 0m away

    90% historically approved · decision due ~26 Aug

    Application to approve details of conditions 3 (Materials), 4 (Fire Safety), 7 (Cycle Storage), 8 (Refuse Storage) and 9 (CPZ Permit) pursuant to application 26/00304/FUL for redevelopment of site to provide 4 residential units involving change of use of ground floor unit from Offices (Class E) to provide 2 self-contained residential units (Class C3), internal reconfiguration to first floor unit to provide an additional residential unit, along with landscaping and associated works.

    Awaiting decision
  • 173 Upper Wickham Lane Welling Kent DA16 3AW

    26/00337/FUL Submitted 18 Feb 2026 29m away

    Erection of a single storey rear extension and alterations to fenestration to side elevation.

    Granted Full applications Extension Windows or glazing 9 docs
    Small domestic
  • 173 Upper Wickham Lane Welling Kent DA16 3AW

    26/00429/FUL Submitted 2 Mar 2026 32m away

    Erection of a detached single storey annexe outbuilding in rear garden.

    Granted Full applications 9 docs
    Small domestic
  • Cabinet Opposite 183 Upper Wickham Lane Welling Kent

    18/01280/GPDOT Submitted 17 May 2018 33m away

    Notice of permitted development for telecommunications apparatus comprising the installation of a cabinet.

    Granted Telecoms 1 doc

In Bexley

  • 26/01363/FUL Granted

    37 Cold Blow Crescent Bexley Kent DA5 2DR

    Erection of part one/part two storey rear/side extension following demolition of existing rear single storey projection.

    10 Jul 2026 Full applications
  • 26/01678/FUL Awaiting decision

    3 Canterbury Avenue Sidcup Kent DA15 9AZ

    Erection of a part one/part two storey front / side extension following demolition of existing garage and rear extension.

    3 Sep 2026 Full applications
  • 26/01679/FUL Awaiting decision

    3 Canterbury Avenue Sidcup Kent DA15 9AZ

    Alterations to front boundary wall involing the installation a sliding gate and railings to existing wall.

    3 Sep 2026 Full applications
  • 26/01346/FUL Granted

    94 - 100 Darenth Road Welling Kent

    Replacement of windows and doors of all elevations with double-glazed uPVC casements.

    9 Jul 2026 Full applications
  • 26/01344/FUL Granted

    40 - 46 Darenth Road Welling Kent

    Replacement of windows and doors of all elevations with double-glazed uPVC casements.

    9 Jul 2026 Full applications