Skip to content
PlanIndex Get alerts
Menu

Planning application

BETHS Grammar School Hartford Road Bexley Kent DA5 1NE

Granted Bexley 25/01715/FUL Detailed Planning Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Application under Section 73 of the Town and Country Planning Act 1990 to vary condition 2 (Approved Plans) of planning permission 24/01724/FUL for the Alterations to layout of existing east entrance and installation of new fencing, turnstiles, gates, lighting and CCTV pole and new pedestrian gate / turnstile to west entrance.

As published by the council, reference 25/01715/FUL

Application record

Reference
25/01715/FUL
Type
Detailed Planning Application
Status
Granted with Conditions
Decision
Permission Granted with Conditions
Received
18 Aug 2025
Validated
8 Sep 2025
Decided
7 Nov 2025
Ward
ST MARYS & ST JAMES
Decision by
Delegated
Postcode
DA5 1NE

Timeline

Dates from the published record

  1. 18 Aug 2025

    Received by Bexley

  2. 8 Sep 2025

    Validated

    Checked as complete and ready for consideration.

  3. 7 Nov 2025

    Decision issued: Permission Granted with Conditions

  4. 10 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

17 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • BETHS Grammar School Hartford Road Bexley Kent DA5 1NE

    18/02010/FUL Submitted 27 Jul 2018 1m away

    Alterations to pedestrian/vehicle access and provision of new security entry system.

    Granted Full applications 12 docs
  • Beths Grammar School Hartford Road Bexley Kent DA5 1NE

    14/01176/FUL Submitted 26 Jun 2014 60m away

    Extension to existing ground floor and provision of a first floor to the existing learning resource centre to create a new sixth form block and relocation of the learning resource centre within the main school building.

    Granted Full applications Extension 13 docs
  • 54 Hartford Road Bexley Kent DA5 1NQ

    26/00496/GPDE Submitted 10 Mar 2026 83m away

    The erection of a single storey rear extension, which would extend beyond the rear wall of the original house by 5.00 metres, for which the maximum height would be 3.15 metres, and for which the height of the eaves would be 3.00 metres.

    Decided Prior approval Extension 9 docs
    Small domestic
  • 54 Hartford Road Bexley Kent DA5 1NQ

    26/00802/GPDE Submitted 23 Apr 2026 87m away

    The erection of a single storey rear extension, which would extend beyond the rear wall of the original house by 5.00 metres, for which the maximum height would be 3.15 metres, and for which the height of the eaves would be 3.00 metres.

    Granted Prior approval Extension 12 docs
    Small domestic
  • 76 Hartford Road Bexley Kent DA5 1NF

    20/00277/FUL Submitted 3 Feb 2020 123m away

    Part one/ Part two storey front, side and rear extension incorporating front porch.

    Granted Full applications Extension 16 docs
    Small domestic
  • 45 Hartford Road Bexley Kent DA5 1NG

    17/01695/FUL01 Submitted 18 Jan 2018 141m away

    Details of conditions 3(materials and finishes), 4(Contaminated Land Assessment), 7(existing vehicular crossover), 8(cycle storage) and 9(refuse and recycling storage) pursuant to planning permission 17/01695/FUL for the erection of 1 x 3 bed end of terrace dwelling.

    Granted Conditions 5 docs
    Domestic

In Bexley

  • 26/01363/FUL Granted

    37 Cold Blow Crescent Bexley Kent DA5 2DR

    Erection of part one/part two storey rear/side extension following demolition of existing rear single storey projection.

    10 Jul 2026 Full applications
  • 26/01678/FUL Awaiting decision

    3 Canterbury Avenue Sidcup Kent DA15 9AZ

    Erection of a part one/part two storey front / side extension following demolition of existing garage and rear extension.

    3 Sep 2026 Full applications
  • 26/01679/FUL Awaiting decision

    3 Canterbury Avenue Sidcup Kent DA15 9AZ

    Alterations to front boundary wall involing the installation a sliding gate and railings to existing wall.

    3 Sep 2026 Full applications
  • 26/01346/FUL Granted

    94 - 100 Darenth Road Welling Kent

    Replacement of windows and doors of all elevations with double-glazed uPVC casements.

    9 Jul 2026 Full applications
  • 26/01344/FUL Granted

    40 - 46 Darenth Road Welling Kent

    Replacement of windows and doors of all elevations with double-glazed uPVC casements.

    9 Jul 2026 Full applications