Skip to content
PlanIndex Get alerts
Menu

Planning application

46 Barnehurst Avenue Bexleyheath Kent DA7 6QB

Granted Bexley 23/01472/FUL Detailed Planning Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey rear extension, garage conversion and elevational changes.

As published by the council, reference 23/01472/FUL

Application record

Reference
23/01472/FUL
Type
Detailed Planning Application
Status
Granted with Conditions
Decision
Permission Granted with Conditions
Received
22 Jun 2023
Validated
27 Jun 2023
Decided
23 Aug 2023
Ward
BARNEHURST
Decision by
Delegated
Postcode
DA7 6QB

Timeline

Dates from the published record

  1. 22 Jun 2023

    Received by Bexley

  2. 27 Jun 2023

    Validated

    Checked as complete and ready for consideration.

  3. 23 Aug 2023

    Decision issued: Permission Granted with Conditions

  4. 8 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 42 Barnehurst Avenue Bexleyheath Kent DA7 6QB

    18/01467/FUL Submitted 6 Jun 2018 20m away

    First floor side extension and conversion of garage to habitable room.

    Granted Full applications Extension 4 docs
  • 55 Barnehurst Avenue Bexleyheath Kent DA7 6QD

    20/00685/GPDE Submitted 18 Mar 2020 58m away

    The erection of a single storey rear extension, which the total extension (including previous enlargements) would extend beyond the rear wall of the original dwelling by 6 metres, for which the maximum height of the total enlargement will be 3 metres, and for which the height of the eaves would be 3 metres.

    Refused Prior approval Extension 4 docs
    Small domestic
  • 55 Barnehurst Avenue Bexleyheath Kent DA7 6QD

    26/01610/FUL Submitted 20 Aug 2026 66m away

    91% historically approved · decision due ~15 Oct

    Single storey rear infill extension and conversion of roof space including front dormer windows and rear dormer extension.

    Awaiting decision Full applications Extension Loft or dormer +1
    Small domestic
  • 72 Barnehurst Avenue Bexleyheath Kent DA7 6QB

    26/01509/FUL Submitted 31 Jul 2026 88m away

    91% historically approved · decision due ~25 Sep

    Conversion of roof space involving alterations to existing roofline, including a hip to gable enlargement, a rear dormer extension with two Juliet Balconies and window to flank rooflsope/rooflights to front roofslope.

    Awaiting decision Full applications Extension Loft or dormer +1
  • 46 Barnehurst Avenue Bexleyheath Kent DA7 6QB

    26/01224/FUL Submitted 22 Jun 2026 88m away

    91% historically approved · decision due ~17 Aug

    Erection of a single storey rear shed (retrospective)

    Awaiting decision Full applications
    Small domestic
  • 88 Appledore Avenue Bexleyheath Kent DA7 6QH

    18/02255/FUL Submitted 28 Aug 2018 104m away

    Conversion of garage to habitable rooms

    Granted Full applications 8 docs

In Bexley

  • 26/01363/FUL Granted

    37 Cold Blow Crescent Bexley Kent DA5 2DR

    Erection of part one/part two storey rear/side extension following demolition of existing rear single storey projection.

    10 Jul 2026 Full applications
  • 26/01678/FUL Awaiting decision

    3 Canterbury Avenue Sidcup Kent DA15 9AZ

    Erection of a part one/part two storey front / side extension following demolition of existing garage and rear extension.

    3 Sep 2026 Full applications
  • 26/01679/FUL Awaiting decision

    3 Canterbury Avenue Sidcup Kent DA15 9AZ

    Alterations to front boundary wall involing the installation a sliding gate and railings to existing wall.

    3 Sep 2026 Full applications
  • 26/01346/FUL Granted

    94 - 100 Darenth Road Welling Kent

    Replacement of windows and doors of all elevations with double-glazed uPVC casements.

    9 Jul 2026 Full applications
  • 26/01344/FUL Granted

    40 - 46 Darenth Road Welling Kent

    Replacement of windows and doors of all elevations with double-glazed uPVC casements.

    9 Jul 2026 Full applications