Planning application
4 Sheppey Close Erith Kent DA8 2JX
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Part one, part two storey rear extension and a front extension including new front porch.
As published by the council, reference 20/00161/FUL
Application record
- Reference
- 20/00161/FUL
- Type
- Detailed Planning Application
- Status
- Granted with Conditions
- Decision
- Permission Granted with Conditions
- Received
- 21 Jan 2020
- Validated
- 10 Feb 2020
- Decided
- 6 Apr 2020
- Ward
- SLADE GREEN & NORTH END
- Decision by
- Delegated
- Postcode
- DA8 2JX
Timeline
Dates from the published record
-
21 Jan 2020
Received by Bexley
-
10 Feb 2020
Validated
Checked as complete and ready for consideration.
-
6 Apr 2020
Decision issued: Permission Granted with Conditions
-
8 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
3 Wallhouse Road Erith Kent DA8 2JT
Lawful development certificate (proposed) for single storey rear extension.
Granted Lawful development Extension 7 docsSmall domestic -
3 Wallhouse Road Erith Kent DA8 2JT
Lawful development certificate (proposed) for single storey rear extension.
Granted Lawful development Extension 7 docsSmall domestic -
14 Beacon Road Erith Kent DA8 2JS
Part one/part two storey rear extension.
Granted Full applications Extension 3 docs -
14 Beacon Road Erith Kent DA8 2JS
Single storey front/side extension, incorporating porch. Single storey side and rear extension and first floor rear extension.
Granted Full applications Extension 10 docsSmall domestic -
32 Hilden Drive Erith Kent DA8 2LP
Conversion of garage to habitable room.
Granted Full applications 9 docs -
231 Slade Green Road Erith Kent DA8 2JW
Lawful Development Certificate (Proposed) for the erection of a single storey detached outbuilding to rear garden.
Granted Lawful development 7 docsSmall domestic
Other full applications applications
In Bexley
-
26/01363/FUL Granted
37 Cold Blow Crescent Bexley Kent DA5 2DR
Erection of part one/part two storey rear/side extension following demolition of existing rear single storey projection.
-
26/01678/FUL Awaiting decision
3 Canterbury Avenue Sidcup Kent DA15 9AZ
Erection of a part one/part two storey front / side extension following demolition of existing garage and rear extension.
-
26/01679/FUL Awaiting decision
3 Canterbury Avenue Sidcup Kent DA15 9AZ
Alterations to front boundary wall involing the installation a sliding gate and railings to existing wall.
-
26/01346/FUL Granted
94 - 100 Darenth Road Welling Kent
Replacement of windows and doors of all elevations with double-glazed uPVC casements.
-
26/01344/FUL Granted
40 - 46 Darenth Road Welling Kent
Replacement of windows and doors of all elevations with double-glazed uPVC casements.