Skip to content
PlanIndex Get alerts
Menu

Planning application

30 Chestnut Drive Bexleyheath Kent DA7 4EN

Granted Bexley 18/02291/FUL Detailed Planning Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey side, rear and front extension.

As published by the council, reference 18/02291/FUL

Application record

Reference
18/02291/FUL
Type
Detailed Planning Application
Status
Granted with Conditions
Decision
Granted As published: Permission Granted with Conditions
Received
29 Aug 2018
Validated
20 Sep 2018
Decided
7 Nov 2018
Ward
CROOK LOG
Decision by
Delegated
Postcode
DA7 4EN

Site history

Applications at this address on the Bexley register

This site has had 2 applications since 2018: 2 approved, 0 refused.

  • 18/02290/LDCP Granted

    30 Chestnut Drive Bexleyheath Kent DA7 4EN

    Lawful Development Certificate (Proposed) for alterations to roofline incorporating hip to gable end, window in side elevation, rear dormer extension with Juliet balcony, extension of soil vent pipe and three rooflights to front roofslope to provide rooms in roofspace.

    Decided 6 Nov 2018 Lawful development

Timeline

Dates from the published record

  1. 29 Aug 2018

    Received by Bexley

  2. 20 Sep 2018

    Validated

    Checked as complete and ready for consideration.

  3. 7 Nov 2018

    Decision issued: Permission Granted with Conditions

  4. 25 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Bexley granted permission on 7 November 2018, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 30 Chestnut Drive Bexleyheath Kent DA7 4EN

    18/02290/LDCP Submitted 29 Aug 2018 50 yards away

    Lawful Development Certificate (Proposed) for alterations to roofline incorporating hip to gable end, window in side elevation, rear dormer extension with Juliet balcony, extension of soil vent pipe and three rooflights to front roofslope to provide rooms in roofspace.

    Granted Lawful development Extension Loft or dormer +1 6 docs
  • 18 Chestnut Drive Bexleyheath Kent DA7 4EN

    26/01793/FUL Submitted 22 Sep 2026 50 yards away

    91% historically approved · decision due ~17 Nov

    Erection of a detached outbuilding to rear.

    Decided Full applications
  • 14 Chestnut Drive Bexleyheath Kent DA7 4EN

    13/01909/FUL Submitted 20 Nov 2013 50 yards away

    Single storey side/rear extension.

    Granted Full applications Extension 19 docs
    Small domestic
  • 47 Chestnut Drive Bexleyheath Kent DA7 4EW

    26/01293/LDCP Submitted 3 Jul 2026 50 yards away

    Lawful Development Certificate (Proposed) for conversion of garage to habitable room involving alterations to front elevation.

    Granted
  • 26 And 26A Brampton Road Bexleyheath Kent DA7 4HD

    18/01926/FULM Submitted 18 Jul 2018 100 yards away

    Demolition of existing bungalows and the erection of a two storey building to provide 2 x 1 bed and 8 x 2 bed flats with the formation of a new access onto Brampton Road and the provision of bin and cycle stores and associated works.

    Granted Full applications New dwelling Demolition 28 docs
    Major scheme
  • 28 Brampton Road Bexleyheath Kent DA7 4HD

    18/01390/FUL Submitted 25 May 2018 100 yards away

    Single storey side and rear extension incorporating front porch.

    Granted Full applications Extension 3 docs
    Small domestic

In Bexley

  • 25/02019/FUL Granted

    56A Avenue Road Bexleyheath Kent DA7 4EG

    Erection of a second floor and three storey rear extension to provide 4 additional self contained residential flats with associated cycle and refuse storage.

    Received 29 Sep, published by the council 10 Aug 2026 Full applications
  • 26/02008/FUL Awaiting decision

    23 Arbuthnot Lane Bexley Kent DA5 1EH

    Erection of a single storey side and single storey rear extension and conversion of garage to habitable room.

    Received 29 Oct, published by the council 2 Nov 2026 Full applications
  • 26/01999/FUL Awaiting decision

    17 - 32 Patricia Court Upper Wickham Lane Welling Kent DA16 3EP

    Replacement of existing windows with uPVC double-glazed windows and balcony doors to be replaced with uPVC to match existing.

    Received 28 Oct, published by the council 2 Nov 2026 Full applications
  • 26/02003/FUL Awaiting decision

    25-47 Heron Crescent Sidcup Kent DA14 6RT

    Replacement of existing windows with uPVC double-glazed windows and balcony doors to be replaced with uPVC to match existing.

    Received 28 Oct, published by the council 2 Nov 2026 Full applications
  • 26/01998/FUL Awaiting decision

    1 - 16 Patricia Court Upper Wickham Lane Welling Kent DA16 3EP

    Replacement of existing windows with uPVC double-glazed windows and balcony doors to be replaced with uPVC to match existing.

    Received 28 Oct, published by the council 2 Nov 2026 Full applications