Planning application
LA04/2026/0739/F
3 Malone Park, Belfast, BT9 6NH
Proposal
Erection of new vehicular entrance pillars and gates, creation of pedestrian access to front of site and erection of new pedestrian pillars and gate.
As published by the council, reference LA04/2026/0739/F
Timeline
Dates from the published record
-
21 Apr 2026
Received by Belfast
-
23 Apr 2026
Validated
Checked as complete and ready for consideration.
-
22 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Belfast for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
LA04/2026/0742/DCA Awaiting decision
3 Malone Park, Belfast, BT9 6NH
Demolition of existing vehicle entrance pillars and gates, partial removal of hedge to front boundary.
-
LA04/2025/1316/DC Decided
14 Malone Park Lane, Belfast, BT9 6NQ
Discharge of condition 2 LA04/2024/1844/F - Soft Landscaping
-
LA04/2026/1141/LBC Awaiting decision
1a Malone Park, Belfast, BT9 6NH
Reconfiguration of dwelling to improve the layout and provide additional ensuite bathroom to include internal wall demolition, replacement of PVC windows with hardwood timber frame sliding sash windows and refurbish the roof, rainwater goods and walls as required.
-
LA04/2026/0765/DCA Awaiting decision
16 Myrtlefield Park, Belfast, BT9 6NE
Demolition of existing side and rear conservatories, partial demolition of rear wall and windows, partial demolition of side walls and removal of doors and windows to side elevations.
-
LA04/2026/0723/F Awaiting decision
16 Myrtlefield Park, Belfast, BT9 6NE
Single-storey rear and side extension, covered patio areas to rear, amended window fenestrations to rear first floor elevation and new door to side elevation at ground floor level.
-
LA04/2025/2022/NMC Granted
9 Harberton Park, Malone Upper, Belfast, BT9 6TW
Non material change to planning application LA04/2024/1806/F- Amended landscaping and associated amended wording of condition no. 02.
Other full applications applications
In Belfast
-
LA04/2026/0883/F Granted
9 Cranmore Park, Belfast, BT9 6JF
Section 54 application for variation of condition 3 of LA04/2024/1982/F - Retention of clear and obscure glazing within windows
-
LA04/2026/0470/F Granted
2a Deramore Park, Belfast, BT9 5JT
Part-retrospective planning application for the removal of existing gates and hedge to facilitate widening of vehicular access. Installation of new sliding security/privacy gate.
-
LA04/2026/0820/F Granted
29 Dalebrook Park, Belfast, BT11 9EW
Two storey side and rear extension with patio
-
LA04/2026/0774/F Granted
83 Wellington Park, Belfast, BT9 6DP
Internal and external alterations to 3no. Existing flats including new re-positioned rear external stairway and fenestration
-
LA04/2026/0981/F Granted
15-19 William Street South, Unit B, Belfast, BT1 4AR
Alterations to shopfront, including relocation of enterance door, change of material and framing to side door, 3x signage and internal refurbishment