Proposal
Single storey rear extension; change of roof profile from hipped to gable; rear dormer. Partial demolition to facilitate.
As published by the council, reference LA04/2026/0700/F
Timeline
Dates from the published record
-
13 Apr 2026
Received by Belfast
-
18 May 2026
Validated
Checked as complete and ready for consideration.
-
8 Jul 2026
Decision issued: Granted
-
22 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
LA04/2026/0840/F Awaiting decision
Rosetta Clear Dental 61-63 Rosetta Road, Belfast, BT6 0LR
Change of Use of First Floor from Dental Surgery (Class D1) to Office (Class B1).
-
LA04/2025/2118/F Granted
41 Rosetta Road, Belfast, BT6 0LR
Two storey rear extension & attic conversion with rooflights to provide additional office space, with facade alterations and alterations to layout on the ground floor
-
LA04/2026/1106/F Awaiting decision
13 Mount Merrion Drive, Ballymaconaghy, Belfast, BT6 0FX
Two storey rear/side extension.
-
LA04/2026/0234/F Granted
80 Cooneen Way, Belfast, BT6 0EG
Single storey rear extension with front ramped access
-
LA04/2025/1320/F Granted
88 Wynchurch Park, Belfast, BT6 0JN
Single storey rear/side extension. Creation of hardstanding area to front. Alterations to drop kerb entrance. Reduction in garage size.
-
LA04/2025/1303/F Granted
34 Mount Merrion Park, Belfast, BT6 0GB
Single storey side and rear extension. Single storey garden room with landscaping and additional site works.
Other full applications applications
In Belfast
-
LA04/2026/0883/F Granted
9 Cranmore Park, Belfast, BT9 6JF
Section 54 application for variation of condition 3 of LA04/2024/1982/F - Retention of clear and obscure glazing within windows
-
LA04/2026/0470/F Granted
2a Deramore Park, Belfast, BT9 5JT
Part-retrospective planning application for the removal of existing gates and hedge to facilitate widening of vehicular access. Installation of new sliding security/privacy gate.
-
LA04/2026/0820/F Granted
29 Dalebrook Park, Belfast, BT11 9EW
Two storey side and rear extension with patio
-
LA04/2026/0774/F Granted
83 Wellington Park, Belfast, BT9 6DP
Internal and external alterations to 3no. Existing flats including new re-positioned rear external stairway and fenestration
-
LA04/2026/0981/F Granted
15-19 William Street South, Unit B, Belfast, BT1 4AR
Alterations to shopfront, including relocation of enterance door, change of material and framing to side door, 3x signage and internal refurbishment