Skip to content
PlanIndex Get alerts
Menu

Planning application

27 Osborne Park, Belfast, BT9 6JN

Granted Belfast LA04/2026/0503/DCA Conservation Area Consent

Works: Demolition Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Part demolition of rear wall and removal of existing patio doors.

As published by the council, reference LA04/2026/0503/DCA

Application record

Reference
LA04/2026/0503/DCA
Type
Conservation Area Consent
Status
Determined
Decision
Granted
Received
16 Mar 2026
Validated
31 Mar 2026
Decided
7 Jul 2026
Ward
Malone
Postcode
BT9 6JN

Site history

Applications at this address on the Belfast register

This site has had 2 applications since 2026: 2 approved, 0 refused.

  • 27 Osborne Park, Belfast, BT9 6JN

    Single-storey rear extension and single storey rear covered area with extension to existing paved terrace.

    Decided 7 Jul 2026 Full applications

Timeline

Dates from the published record

  1. 16 Mar 2026

    Received by Belfast

  2. 31 Mar 2026

    Validated

    Checked as complete and ready for consideration.

  3. 7 Jul 2026

    Decision issued: Granted

  4. 22 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Place Lab Limited Agent, registered in Belfast

Active · incorporated 2012 · Belfast

6 applications on PlanIndex · across 2 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Belfast granted permission on 7 July 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 27 Osborne Park, Belfast, BT9 6JN

    LA04/2026/0502/F Submitted 16 Mar 2026 0m away

    Single-storey rear extension and single storey rear covered area with extension to existing paved terrace.

    Granted Full applications Extension 14 docs
    Small domestic
  • 16a Maryville Park, Belfast, BT9 6LN

    LA04/2026/1084/DCA Submitted 9 Jun 2026 57m away

    Demolition of garage roof, partial demolition of garage walls.

    Granted Heritage and listed buildings Demolition 6 docs
  • 16a Maryville Park, Belfast, BT9 6LN

    LA04/2026/1061/F Submitted 4 Jun 2026 57m away

    Extension to rear of existing garage. (Amended proposal and description).

    Granted Full applications Extension 10 docs
  • 16a Maryville Park, Belfast, BT9 6LN

    LA04/2026/0622/DCA Submitted 30 Mar 2026 57m away

    Demolition of windows, window frames, rainwater goods and entrance gate for replacements

    Granted Heritage and listed buildings Demolition Windows or glazing 11 docs
  • 16a Maryville Park, Belfast, BT9 6LN

    LA04/2026/0605/F Submitted 30 Mar 2026 57m away

    Proposed solar slates to front and rear elevation on roof, alterations to windows and rainwater goods. Replacement of front entrance gate with a new iron gate (Amended description and drawings)

    Granted Full applications Roofing Windows or glazing 12 docs
  • 40 Osborne Park, Belfast, BT9 6JN

    LA04/2024/1731/DCA Submitted 15 Oct 2024 77m away

    Partial removal of rear elevation wall, ground floor windows and door. Demolition of outside WC, rear porch and some internal walls.

    Granted Heritage and listed buildings Extension Demolition +1 8 docs
    Small domestic

In Belfast

  • 36-38 Donegall Place, Belfast, BT1 5BB

    Installation of teller counter position within refurbished bank.

    Received 7 Aug, published by the council 13 Aug 2026 Heritage and listed buildings
  • 36-38 Donegall Place, Belfast, BT1 5BB

    Transom to shop glazing with obscured glazing to conceal internal steelwork.

    Received 6 Aug, published by the council 13 Aug 2026 Heritage and listed buildings
  • Belfast Harbour Office and William Ritchie Building Corporation Square and 2 Clarendon Road, Belfast, BT1 3AL

    Removal of existing link between the Belfast Harbour Office and William Ritchie Building, Erection of new link bridge and reinstatement of northern gable of Harbour Office. Reinstatement of cellar entrance. Entrance ramp to William Ritchie Building. Erection of a new gate and railings along the eastern boundary.

    Received 2 Apr, published by the council 22 Jul 2026 Heritage and listed buildings
  • Clanmil Housing Association Northern Whig House 3 Waring Street Belfast BT1 2DX

    Re-roofing works comprising removal of bitumen felt and replacement with polymeric single-ply membrane. Replacement of rainwater goods (internally & externally), lead flashings, edge trims to facilitate roofing works.

    Received 24 Mar, published by the council 22 Jul 2026 Heritage and listed buildings
  • 22-24 Berry Street, Belfast, BT1 1FJ

    Demolition of existing shopfront to allow for alterations

    Received 24 Apr, published by the council 22 Jul 2026 Heritage and listed buildings