Planning application
LA04/2026/0374/F
17 Castlemore Avenue, Belfast, BT6 9RF
Proposal
Retention of lean to garage to side of dwelling and area of hardstanding to front (Amended Description and plans).
As published by the council, reference LA04/2026/0374/F
Timeline
Dates from the published record
-
2 Mar 2026
Received by Belfast
-
3 Mar 2026
Validated
Checked as complete and ready for consideration.
-
22 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Belfast for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
LA04/2025/2158/F Granted
1 Casaeldona Park, Belfast, BT6 9RB
Two storey rear extension to existing dwelling with raised balcony. External alterations to dwelling with new access steps to front. Proposed 2 storey detached garage to side and relocated vehicular access
-
LA04/2026/0711/F Granted
10 Casaeldona Rise, Belfast, BT6 9RA
single-storey rear extension and first-floor rear extension; alterations to windows
-
LA04/2026/0024/F Granted
7 Glensharragh Avenue, Belfast, BT6 9PD
Change of roof profile from hip to gable and rear dormer
-
LA04/2026/1022/F Awaiting decision
11 Orchardvale, Belfast, BT6 9TA
Proposed new detached garage and games room to rear of existing dwelling including new driveway access
-
LA04/2026/0950/A Granted
1 Ballygowan Road, Belfast, BT5 7LH
Replacement of existing 48-sheet billboard with 48-sheet digital LED display (static display of 6 rotations with 10-seconds per display).
-
LA04/2025/1962/F Granted
9 Lead Hill Park, Belfast, BT6 9RW
Single storey rear and side extension. Removal of existing garage.
Other full applications applications
In Belfast
-
LA04/2026/0883/F Granted
9 Cranmore Park, Belfast, BT9 6JF
Section 54 application for variation of condition 3 of LA04/2024/1982/F - Retention of clear and obscure glazing within windows
-
LA04/2026/0470/F Granted
2a Deramore Park, Belfast, BT9 5JT
Part-retrospective planning application for the removal of existing gates and hedge to facilitate widening of vehicular access. Installation of new sliding security/privacy gate.
-
LA04/2026/0820/F Granted
29 Dalebrook Park, Belfast, BT11 9EW
Two storey side and rear extension with patio
-
LA04/2026/0774/F Granted
83 Wellington Park, Belfast, BT9 6DP
Internal and external alterations to 3no. Existing flats including new re-positioned rear external stairway and fenestration
-
LA04/2026/0981/F Granted
15-19 William Street South, Unit B, Belfast, BT1 4AR
Alterations to shopfront, including relocation of enterance door, change of material and framing to side door, 3x signage and internal refurbishment