Skip to content
PlanIndex Get alerts
Menu

Planning application

15 Ormiston Crescent, Belfast, BT4 3JP

Awaiting decision Belfast LA04/2026/0226/F Full

Works: Extension Demolition Small domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Demolition of rear return and partial demolition of rear ground floor wall with proposed single storey extension to rear.

As published by the council, reference LA04/2026/0226/F

Application record

Reference
LA04/2026/0226/F
Type
Full
Status
Under Consideration
Received
9 Feb 2026
Validated
9 Feb 2026
Ward
Knock
Postcode
BT4 3JP

Timeline

Dates from the published record

  1. 9 Feb 2026

    Received by Belfast

  2. 22 Jul 2026

    Added to PlanIndex

  3. 24 Aug 2026

    Status changed to Under Consideration

    Previously Site Inspection Complete.

  4. Decision

    Awaiting decision

    Decision expected by 6 April 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Belfast took a median of 101 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Conor McKenna Architect Agent, an architecture practice

17 applications on PlanIndex · across 4 councils · 80% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Belfast for determination, against a statutory target of eight weeks. Over the last year Belfast decided full applications in a median of 119 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 23 Ormiston Crescent, Belfast, BT4 3JP

    LA04/2023/2782/F Submitted 28 Feb 2023 31m away

    Demolition of existing conservatory and garage. Construction a new single storey rear extension and a new single storey store and studio/office to the rear/side. Decking area to rear.

    Granted Full applications Extension Demolition 9 docs
    Small domestic
  • 1 GREENWOOD PARK BALLYCLOGHAN BELFAST DOWN BT4 3JN

    LA04/2023/2546/F Submitted 24 Jan 2023 108m away

    Demolition of two single-storey rear extensions and the addition of a single-storey extension to the rear with a flat roof.

    Granted Full applications Extension Demolition 7 docs
    Small domestic
  • 2 Ormiston Parade, Belfast, BT4 3JR

    LA04/2025/2098/F Submitted 26 Nov 2025 117m away

    Demolition of garage and addition of two storey side extension and single storey rear extension.

    Granted Full applications Extension Demolition 14 docs
    Small domestic
  • 484 Upper Newtownards Road, Belfast,BT4 3GZ

    LA04/2026/0013/DC Submitted 19 Dec 2025 120m away

    Discharge of Conditions 5 & 6 of Planning Permission LA04/2022/0061/F - Verification Report

    Granted Conditions 5 docs
  • 484 Upper Newtownards Road, Belfast, BT4 3GZ

    LA04/2026/0607/DC Submitted 27 Mar 2026 123m away

    LA04/2022/0061/F - discharge of condition 4 - Acoustic Assessment report

    Granted Conditions 8 docs
  • 18 Greenwood Park, Belfast, BT4 3JN

    LA04/2025/1840/F Submitted 30 Oct 2025 125m away

    Demolition of rear return. Two storey rear extension with additional single storey extension. New window to gable. (Part retrospective).

    Granted Full applications Extension Demolition +1 8 docs
    Small domestic

In Belfast

  • 16 Sans Souci Park, Belfast, BT9 5BZ

    Solar Panels on the south facing roof slope

    Received 13 Nov, published by the council 22 Jul 2026 Full applications
  • 10 Casaeldona Rise, Belfast, BT6 9RA

    single-storey rear extension and first-floor rear extension; alterations to windows

    Received 15 Apr, published by the council 22 Jul 2026 Full applications
  • LA04/2026/0421/F Withdrawn

    Footpath south of 272-274 Upper Newtownards Road, Belfast, County Antrim, BT4 3EU

    Existing 11.5m lamp post to be removed and replaced with a 20m street pole with a wraparound cabinet. Proposed 9no. antennas, 2no. GPS nodes, 1no. bowler cabinet, 1no. cabinet, and ancillary upgrades thereto.

    Received 5 Mar, published by the council 22 Jul 2026 Full applications
  • 17 Castlemore Avenue, Belfast, BT6 9RF

    Retention of lean to garage to side of dwelling and area of hardstanding to front (Amended Description and plans).

    Received 2 Mar, published by the council 22 Jul 2026 Full applications
  • 142 Ravenhill Road, Belfast, BT6 8ED

    Change of use from ground floor shop (A1) to studio apartment (C1) alterations to building facades and additional site works.

    Received 14 Apr, published by the council 6 Aug 2026 Full applications