Planning application
LA04/2025/2194/F
28 Rosepark East, Belfast, BT5 7RL
Proposal
Two storey side and rear extension and raised rear terrace with pergola. Alterations to boundary with widened access and new hardstanding. Extension to existing garden store to rear. (Amended Plans)
As published by the council, reference LA04/2025/2194/F
Timeline
Dates from the published record
-
18 Dec 2025
Received by Belfast
-
22 Dec 2025
Validated
Checked as complete and ready for consideration.
-
22 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Belfast for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
LA04/2025/1792/F Granted
8 Rosepark Central, Ballymiscaw, Belfast, BT5 7RN
Single storey rear extension.
-
LA04/2025/1769/F Granted
42 Rosepark, Belfast, BT5 7RH
Dormer windows to front and rear. New single storey rear alongside new rooflights to front and rear and new porch canopy to front elevation. Includes all associated siteworks. (Amended Scheme & Proposal Description)
-
LA04/2026/0300/F Granted
2 Rosepark, Belfast, BT5 7RG
Proposed rear single storey kitchen and dining room extension, fenestration alterations and removal of rear chimney stack.
-
LA04/2025/1599/NMC Awaiting decision
The Maynard Sinclair Pavilion Stormont Estate, Belfast, BT4 3TA
Application to alter the intended phasing for delivery of the project, including a phased approach to sectional completion of the proposed new Pavilion building.
-
LA04/2025/2033/F Granted
The Maynard Sinclair Pavilion Stormont Estate, Belfast, BT4 3TA
Variation of conditions, 3, 6, 7, 8, 9, 12, 13. 14, 24, 25 and 27 of planning approval LA04/2023/2459/F to allow for phasing of the development.
Other full applications applications
In Belfast
-
LA04/2026/0883/F Granted
9 Cranmore Park, Belfast, BT9 6JF
Section 54 application for variation of condition 3 of LA04/2024/1982/F - Retention of clear and obscure glazing within windows
-
LA04/2026/0470/F Granted
2a Deramore Park, Belfast, BT9 5JT
Part-retrospective planning application for the removal of existing gates and hedge to facilitate widening of vehicular access. Installation of new sliding security/privacy gate.
-
LA04/2026/0820/F Granted
29 Dalebrook Park, Belfast, BT11 9EW
Two storey side and rear extension with patio
-
LA04/2026/0774/F Granted
83 Wellington Park, Belfast, BT9 6DP
Internal and external alterations to 3no. Existing flats including new re-positioned rear external stairway and fenestration
-
LA04/2026/0981/F Granted
15-19 William Street South, Unit B, Belfast, BT1 4AR
Alterations to shopfront, including relocation of enterance door, change of material and framing to side door, 3x signage and internal refurbishment