Skip to content
PlanIndex Get alerts
Menu

Planning application

LA04/2025/1962/F

9 Lead Hill Park, Belfast, BT6 9RW

Granted Belfast Full

Proposal

Single storey rear and side extension. Removal of existing garage.

As published by the council, reference LA04/2025/1962/F

Timeline

Dates from the published record

  1. 17 Nov 2025

    Received by Belfast

  2. 16 Dec 2025

    Validated

    Checked as complete and ready for consideration.

  3. 16 Apr 2026

    Decision issued: Granted

  4. 22 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 59 Ballygowan Road, Belfast, BT5 7LJ

    Single and 1.5 storey extension to the rear of dwelling

    10 Feb 2026 139m away Full applications
  • 1 Ballygowan Road, Belfast, BT5 7LH

    Replacement of existing 48-sheet billboard with 48-sheet digital LED display (static display of 6 rotations with 10-seconds per display).

    20 May 2026 212m away Advertising
  • 10 Casaeldona Rise, Belfast, BT6 9RA

    single-storey rear extension and first-floor rear extension; alterations to windows

    15 Apr 2026 318m away Full applications
  • LA04/2026/0824/F Awaiting decision

    53 Roddens Crescent, Belfast, BT5 7JN

    Replace existing conservatory with single storey rear extension to dwelling and internal alterations

    6 May 2026 377m away Full applications
  • Grassed verge between Knock Road and Roddens Park, approx. 20m west of 54 Roddens Park, Clarawood, BT5 6QD

    The proposal comprises of the installation of a 20m monopole, supporting 6 no. antennas, 1 no. transmission dish, 2 no. equipment cabinets, 1 no. electric meter equipment cabinet and ancillary development thereto including 3 no. Ericsson Radio Systems (ERS’s), 1 no. GPS module and 1m high retaining wall combined with handrail around the back permitter of the site.

    29 Aug 2025 396m away Full applications
  • 1 Casaeldona Park, Belfast, BT6 9RB

    Two storey rear extension to existing dwelling with raised balcony. External alterations to dwelling with new access steps to front. Proposed 2 storey detached garage to side and relocated vehicular access

    16 Dec 2025 426m away Full applications

In Belfast

  • 9 Cranmore Park, Belfast, BT9 6JF

    Section 54 application for variation of condition 3 of LA04/2024/1982/F - Retention of clear and obscure glazing within windows

    12 May 2026 Full applications
  • 2a Deramore Park, Belfast, BT9 5JT

    Part-retrospective planning application for the removal of existing gates and hedge to facilitate widening of vehicular access. Installation of new sliding security/privacy gate.

    10 Mar 2026 Full applications
  • 29 Dalebrook Park, Belfast, BT11 9EW

    Two storey side and rear extension with patio

    28 Apr 2026 Full applications
  • 83 Wellington Park, Belfast, BT9 6DP

    Internal and external alterations to 3no. Existing flats including new re-positioned rear external stairway and fenestration

    27 Apr 2026 Full applications
  • 15-19 William Street South, Unit B, Belfast, BT1 4AR

    Alterations to shopfront, including relocation of enterance door, change of material and framing to side door, 3x signage and internal refurbishment

    27 May 2026 Full applications