Skip to content
PlanIndex Get alerts
Menu

Planning application

348 - 350 Ormeau Road, Belfast, BT7 2HL

Granted Belfast LA04/2025/1947/LBC Listed Building Consent

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Temporary retention of boundary fence/hoarding for 3 years to the front and side of site boundary.

As published by the council, reference LA04/2025/1947/LBC

Application record

Reference
LA04/2025/1947/LBC
Type
Listed Building Consent
Status
Determined
Decision
Granted
Received
12 Nov 2025
Validated
14 Nov 2025
Decided
3 Mar 2026
Ward
Ormeau
Postcode
BT7 2HL

Site history

Applications at this address on the Belfast register

This site has had 2 applications since 2025: 2 approved, 0 refused.

  • 348 - 350 Ormeau Road, Belfast, BT7 2HL

    Temporary retention of boundary fence/hoarding for 3 years to the front and side of site boundary.

    Decided 12 May 2026 Full applications

Timeline

Dates from the published record

  1. 12 Nov 2025

    Received by Belfast

  2. 14 Nov 2025

    Validated

    Checked as complete and ready for consideration.

  3. 3 Mar 2026

    Decision issued: Granted

  4. 22 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Clyde Shanks Ltd Agent, registered in Belfast

Active · incorporated 2011 · Belfast

89 applications on PlanIndex · across 11 councils · 98% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Belfast granted permission on 3 March 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 348 - 350 Ormeau Road, Belfast, BT7 2HL

    LA04/2025/1925/F Submitted 12 Nov 2025 0m away

    Temporary retention of boundary fence/hoarding for 3 years to the front and side of site boundary.

    Granted Full applications 10 docs
    Small domestic
  • Belfast Sports & Spinal 346 Ormeau Road, Ormeau, Belfast, BT7 2HL

    LA04/2026/0478/F Submitted 11 Mar 2026 22m away

    98% historically approved · decision due ~28 May

    Two Storey extension to rear and sides of existing 3 storey end terrace commercial property

    Awaiting decision Full applications Extension 8 docs
  • 26 Rossmore Avenue, Belfast, BT7 3HB

    LA04/2025/1735/F Submitted 8 Oct 2025 112m away

    Single storey rear extension. Demolition of rear walls, 2 No. rear/side windows and rear door.

    Granted Full applications Extension Demolition +1 16 docs
    Small domestic
  • Apartment 4 48 Rossmore Drive, Ormeau, Belfast, BT7 3LA

    LA04/2025/0084/LBC Submitted 22 Jan 2025 150m away

    98% historically approved · decision due ~19 Mar

    Replacement of two single-glazed, sash kitchen windows and single-glazed back door.

    Awaiting decision Heritage and listed buildings Windows or glazing 12 docs
  • 8 St Judes Crescent, Belfast, BT7 2GW

    LA04/2026/1175/F Submitted 29 Jun 2026 157m away

    98% historically approved · decision due ~24 Aug

    Proposed change of use from dwelling to short term let accommodation

    Awaiting decision Full applications 13 docs
    Domestic
  • Family Ministry Office 3 Good Shepherd Centre 511 Ormeau Road, Ormeau, Belfast, BT7 3GS

    LA04/2026/1154/DC Submitted 26 Jun 2026 160m away

    100% historically approved · decision due ~21 Aug

    Discharge of condition 2 for application LA04/2025/0850/LBC - Columbarian Units and Face Plate Finishes

    Awaiting decision Conditions 4 docs

In Belfast

  • 36-38 Donegall Place, Belfast, BT1 5BB

    Installation of teller counter position within refurbished bank.

    Received 7 Aug, published by the council 13 Aug 2026 Heritage and listed buildings
  • 36-38 Donegall Place, Belfast, BT1 5BB

    Transom to shop glazing with obscured glazing to conceal internal steelwork.

    Received 6 Aug, published by the council 13 Aug 2026 Heritage and listed buildings
  • Belfast Harbour Office and William Ritchie Building Corporation Square and 2 Clarendon Road, Belfast, BT1 3AL

    Removal of existing link between the Belfast Harbour Office and William Ritchie Building, Erection of new link bridge and reinstatement of northern gable of Harbour Office. Reinstatement of cellar entrance. Entrance ramp to William Ritchie Building. Erection of a new gate and railings along the eastern boundary.

    Received 2 Apr, published by the council 22 Jul 2026 Heritage and listed buildings
  • Clanmil Housing Association Northern Whig House 3 Waring Street Belfast BT1 2DX

    Re-roofing works comprising removal of bitumen felt and replacement with polymeric single-ply membrane. Replacement of rainwater goods (internally & externally), lead flashings, edge trims to facilitate roofing works.

    Received 24 Mar, published by the council 22 Jul 2026 Heritage and listed buildings
  • 22-24 Berry Street, Belfast, BT1 1FJ

    Demolition of existing shopfront to allow for alterations

    Received 24 Apr, published by the council 22 Jul 2026 Heritage and listed buildings