Planning application
20 Tweskard Park, Belfast, BT4 2JZ
Works: Extension Loft or dormer Roofing Windows or glazing Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Roof alterations, replacing existing flat roof with pitched roof with velux windows. Removal of chimney. Single storey rear extension to dwelling and garage. Fenestration changes. Additon of Veranda to rear. Creation of new side entrance and steps. Patio extension with associated alterations.
As published by the council, reference LA04/2025/1612/F
Application record
- Reference
- LA04/2025/1612/F
- Type
- Full
- Status
- Determined
- Decision
- Granted
- Received
- 24 Sep 2025
- Validated
- 1 Oct 2025
- Decided
- 16 Feb 2026
- Ward
- Garnerville
- Postcode
- BT4 2JZ
Timeline
Dates from the published record
-
24 Sep 2025
Received by Belfast
-
1 Oct 2025
Validated
Checked as complete and ready for consideration.
-
16 Feb 2026
Decision issued: Granted
-
22 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Robert Gilmour Architects Agent, an architecture practice
54 applications on PlanIndex · across 6 councils · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
14 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Belfast granted permission on 16 February 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
20 Massey Park, Belfast, BT4 2JX
98% historically approved · decision due ~9 Apr
Demolition of existing detached garage with proposed adjoining garage/garden room incorporating partial loft with raised patio. Proposed dormer window to rear of dwelling to match existing dormers.
Awaiting decision Full applications Loft or dormer Demolition +1 13 docsSmall domestic -
293 Belmont Road, Belfast, BT4 2LB
Alterations to dwelling to include external cladding to rear + side elevations, new window/door openings, new roof to rear return, partial removal of chimney and internal works.
Granted Full applications Roofing Windows or glazing 14 docsDomestic -
Netherleigh House, 1 Massey Avenue, Belfast, BT4 2JP
98% historically approved · decision due ~13 Jan
Change of use of Netherleigh House and existing office blocks (Class B1) to provide residential and nursing care facilities (Class C3 (a) and (b)). Extensions to existing office block including a fourth storey floor, eastern and western gable extension and two front projections from the northern elevation. Erection of 36 no. assisted living apartments over two four storey blocks. Site parking, landscaped amenity areas, woodland trails and all associated site works
Awaiting decision Full applications New dwelling Extension 116 docs -
Netherleigh House, 1 Massey Avenue, Belfast, BT4 2JP
98% historically approved · decision due ~13 Jan
Change of use of Netherleigh House and existing office blocks (Class B1) to provide residential and nursing care facilities (Class C3 (a) and (b)). Extensions to existing office block including a fourth storey floor, eastern and western gable extension and two front projections from the northern elevation. Erection of 36 no. assisted living apartments over two four storey blocks. Site parking, landscaped amenity areas, woodland trails and all associated site works
Awaiting decision Heritage and listed buildings New dwelling Extension 82 docs -
35a Cloverhill Park, Belfast, BT4 2JW
98% historically approved · decision due ~10 Jul
Retrospective application for revisions to original approval under LA04/2021/0889/F including fenestration changes and revisions to landscaping
Awaiting decision Full applications Windows or glazing 7 docs -
127 Castlehill Road, Belfast, BT4 3GQ
Single storey rear extension, new steps to rear.
Granted Full applications Extension 7 docsSmall domestic
Other full applications
In Belfast
-
LA04/2025/1954/F Granted
16 Sans Souci Park, Belfast, BT9 5BZ
Solar Panels on the south facing roof slope
-
LA04/2026/0711/F Granted
10 Casaeldona Rise, Belfast, BT6 9RA
single-storey rear extension and first-floor rear extension; alterations to windows
-
LA04/2026/0421/F Withdrawn
Footpath south of 272-274 Upper Newtownards Road, Belfast, County Antrim, BT4 3EU
Existing 11.5m lamp post to be removed and replaced with a 20m street pole with a wraparound cabinet. Proposed 9no. antennas, 2no. GPS nodes, 1no. bowler cabinet, 1no. cabinet, and ancillary upgrades thereto.
-
LA04/2026/0374/F Granted
17 Castlemore Avenue, Belfast, BT6 9RF
Retention of lean to garage to side of dwelling and area of hardstanding to front (Amended Description and plans).
-
LA04/2025/0635/F Refused
142 Ravenhill Road, Belfast, BT6 8ED
Change of use from ground floor shop (A1) to studio apartment (C1) alterations to building facades and additional site works.