Skip to content
PlanIndex Get alerts
Menu

Planning application

Units 2a and 2b 38 Boucher Road, Belfast, BT12 6HR

Granted Belfast LA04/2025/1525/F Full

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Removal of condition 9 of LA04/2024/0714/F (Removal of fuel storage tanks)

As published by the council, reference LA04/2025/1525/F

Application record

Reference
LA04/2025/1525/F
Type
Full
Status
Determined
Decision
Granted
Received
9 Sep 2025
Validated
9 Sep 2025
Decided
24 Dec 2025
Ward
Blackstaff
Postcode
BT12 6HR

Site history

Applications at this address on the Belfast register

This site has had 8 applications since 2025: 6 approved, 0 refused.

  • LA04/2026/1554/DC Awaiting decision

    Units 2a and 2b 38 Boucher Road, Belfast, BT12 6HR

    Discharge of condition no 17 of planning appoval LA04/2024/0714/F- Draft Employability and Skills Plan

    Submitted 4 Sep 2026 Conditions
  • Units 2a and 2b 38 Boucher Road, Belfast, BT12 6HR

    Removal of conditions 14 and 15 from the permission referenced LA04/2024/0714/F (Contamination)

    Decided 9 Mar 2026 Full applications
  • Units 2a and 2b 38 Boucher Road, Belfast, BT12 6HR

    Discharge of condition 12 LA04/2024/0714/F- Sewage Disposal Method.

    Decided 5 Nov 2025 Conditions
  • Units 2a and 2b 38 Boucher Road, Belfast, BT12 6HR

    Discharge of Condition 17 of LA04/2024/0714/F- Employability and Skills Plan.

    Decided 10 Mar 2026 Conditions
  • LA04/2025/1479/DC Withdrawn

    Units 2a and 2b 38 Boucher Road, Belfast, BT12 6HR

    Discharge condition 14 of LA04/2024/0714/F.-Detailed Remediation Strategy

    Submitted 1 Sep 2025 Conditions
  • Units 2a and 2b 38 Boucher Road, Belfast, BT12 6HR

    Discharge of condition 13 LA04/2024/0714/F- Landscaping Scheme (Condition amended under Non Material Change Application LA04/2025/1605/NMC)

    Decided 3 Dec 2025 Conditions
  • Units 2a and 2b, 38 Boucher Road, Belfast, BT12 6HR

    Discharge of condition 8 of LA04/2024/0714/F - Piling Risk Assessment

    Decided 3 Oct 2025 Conditions

Timeline

Dates from the published record

  1. 9 Sep 2025

    Received by Belfast

  2. 24 Dec 2025

    Decision issued: Granted

  3. 22 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Pragma Planning and Development Consultants Ltd Agent, a planning consultancy registered in Belfast

Active · incorporated 2003 · Belfast

39 applications on PlanIndex · across 3 councils · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Belfast granted permission on 24 December 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Belfast

  • Hammer Playing Pitch Agnes Street, Shankill Road, Belfast, BT13

    Resurfacing and minor extension of existing 3G pitch; replacement floodlighting; 50 seater covered mini-stand (3.8m tall by 7.5m long and 3.3m wide); additional 1.2m fencing enclosure to pitch; replacement dugouts: storage container (3.6m by 2.4m); removal of portacabin and associated minor works/drainage modifications.

    Received 27 Jan, published by the council 6 Aug 2026 Full applications
  • 15 Stockmans Avenue, Belfast, BT11 9AS

    Addition of a two-storey rear extension to existing dwelling, and small rear decking area

    Received 15 Dec, published by the council 22 Jul 2026 Full applications
  • 1 Greystown Avenue, Belfast, BT9 6UG

    Proposed extensions to side & rear elevation, together with facade alterations to front of existing dwelling & recladding of existing dormer to rear (Amended Plans)

    Received 4 Dec, published by the council 22 Jul 2026 Full applications
  • Lands at Apartment Blocks 1-3 Clonaver Drive, Belfast, BT4 2FB

    Proposed amendment to condition No.7 of planning approval LA04/2023/2709/F to no longer provide and install the vapour protection measures that were originally requested.

    Received 20 Oct, published by the council 22 Jul 2026 Full applications
  • 104 Gilnahirk Road, Belfast, BT5 7DJ

    Single storey side extension. First floor side window to Eastern elevation. Replacement side windows.

    Received 18 Dec, published by the council 22 Jul 2026 Full applications