Planning application
The Royal Belfast Academical Institution College Square East, Belfast, BT1 6DL
Works: Extension Demolition
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Construction of a new South Wing of the RBAI Campus to include multi-purpose dining hall, 15 general classrooms, a drama suite, a 25m swimming pool, a Board Room suite, living accommodation for the School Steward with PV panels on roof and new, small extension to the Soane Building, to provide improved accessibility and upgraded WC facilities, with associated refurbishment and re-modelling of first and second floor classrooms to the southern end of the Soane Building, the development of landscaped zones including the under-croft area at the Common Hall and new boundary treatment at Durham Street and demolition of the existing dining hall, swimming pool and W-Block (amended description)
As published by the council, reference LA04/2024/0321/LBC
Application record
- Reference
- LA04/2024/0321/LBC
- Type
- Listed Building Consent
- Status
- Determined
- Decision
- Granted
- Received
- 20 Feb 2024
- Validated
- 20 Feb 2024
- Decided
- 21 Nov 2024
- Ward
- Central
- Postcode
- BT1 6DL
Timeline
Dates from the published record
-
20 Feb 2024
Received by Belfast
-
21 Nov 2024
Decision issued: Granted
-
6 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a planning consultancy registered in Co Down
41 applications on PlanIndex · across 8 councils · 100% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
38 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About heritage and listed buildings applications
How this application type works
Heritage applications concern listed buildings and conservation areas. Listed building consent is needed for works, inside or out, that affect the special interest of a listed building, and carrying out such works without consent is a criminal offence. The council weighs harm to the heritage asset against any public benefit of the proposal.
More on heritage and listed buildings applications in our guide
Nearby applications
Within 500 metres
-
The Royal Belfast Academical Institution College Square East, Belfast, BT1 6DL
Discharge Condition 3 of LA04/2024/0344/F- Material samples.
Decided Conditions 5 docs -
The Royal Belfast Academical Institution College Square East, Belfast, BT1 6DL
Demolition of the school steward's house. The proposed demolition forms part of the overall RBAI Campus Vision proposal which is the subject of a related planning application (ref. LA04/2024/0344/F) and listed building consent application (ref. LA04/2024/0321/LBC) (amended description).
Granted Heritage and listed buildings Demolition 12 docs -
The Royal Belfast Academical Institution College Square East, Belfast, BT1 6DL
Construction of a new South Wing of the RBAI Campus to include multi-purpose dining hall, 15 general classrooms, a drama suite, a 25m swimming pool, a Board Room suite, living accommodation for the School Steward with PV panels on roof and new, small extension to the Soane Building, to provide improved accessibility and upgraded WC facilities, with associated refurbishment and re-modelling of first and second floor classrooms to the southern end of the Soane Building, the development of landscaped zones including the under-croft area at the Common Hall and new boundary treatment at Durham Street and demolition of the existing dining hall, swimming pool, school steward's house and W-Block.
Granted Full applications Extension Demolition 83 docs -
Glendinning House, 6 Murray Street, Belfast, Belfast, BT1 6DN
Removal of existing windows to Athol Street Elevation and the installation of new windows and associated works.
Granted Heritage and listed buildings Windows or glazing 12 docs -
Third Floor, Glendinning House, 6 Murray Street, Belfast, Belfast, BT1 6DN
Refurbishment and fit-out works to the third floor office accommodation
Granted Heritage and listed buildings 13 docs -
Glendinning House, 6 Murray Street, Belfast, BT1 6DN
Removal of existing entrance door to Athol Street Elevation and installation of new entrance door and associated works.
Granted Heritage and listed buildings 15 docs
Other heritage and listed buildings applications
In Belfast
-
LA04/2026/0609/LBC Granted
Clanmil Housing Association Northern Whig House 3 Waring Street Belfast BT1 2DX
Re-roofing works comprising removal of bitumen felt and replacement with polymeric single-ply membrane. Replacement of rainwater goods (internally & externally), lead flashings, edge trims to facilitate roofing works.
-
LA04/2026/0810/DCA Granted
22-24 Berry Street, Belfast, BT1 1FJ
Demolition of existing shopfront to allow for alterations
-
LA04/2025/1464/DCA Granted
38 Eglantine Avenue, Belfast, BT9 6DX
Demolition works to facilitate conversion of Existing Short-Term Let to 5 No. 1-Bedroom Short-Term Let Apartments
-
LA04/2026/1084/DCA Granted
16a Maryville Park, Belfast, BT9 6LN
Demolition of garage roof, partial demolition of garage walls.
-
LA04/2026/1472/LBC Awaiting decision
Queen's University Belfast David Keir Building 39-123 Stranmillis Road, Belfast, BT9 5AG
The proposed works are to install an externally mounted Automated External Defibrillator (AED) on the David Keir Building at QUB. The purpose of the installation is to provide rapid, publicly accessible emergency equipment in a location with high footfall.