Skip to content
PlanIndex Get alerts
Menu

Planning application

Fermanagh House 20A Ormeau Avenue Belfast BT2 8NJ

Granted Belfast LA04/2022/2282/DCA Conservation Area Consent

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Removal of existing external brickwork chimney and flue.

As published by the council, reference LA04/2022/2282/DCA

Application record

Reference
LA04/2022/2282/DCA
Type
Conservation Area Consent
Status
Determined
Decision
Granted
Received
21 Nov 2022
Validated
21 Nov 2022
Decided
2 Jun 2023
Ward
Central
Postcode
BT2 8NJ

Site history

Applications at this address on the Belfast register

This site has had 3 applications since 2022: 2 approved, 0 refused.

  • LA04/2026/1223/F Awaiting decision

    Fermanagh House, 20A Ormeau Avenue, Belfast, BT2 8NJ

    Change of use from offices to a 40 bedroom hotel including all associated site works.

    Submitted 6 Jul 2026 Full applications
  • Fermanagh House 20A Ormeau Avenue Belfast BT2 8NJ

    Proposed demolition of external chimney structure and stainless steel flue above to be replaced by slate roof.

    Decided 2 Jun 2023 Full applications

Timeline

Dates from the published record

  1. 21 Nov 2022

    Received by Belfast

  2. 2 Jun 2023

    Decision issued: Granted

  3. 6 Oct 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Belfast granted permission on 2 June 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Belfast

  • Arthur House, 24-26 Arthur Street, Belfast, BT1 4GB

    Demolition of curtain walling on sixth floor and existing roof and plant area. demolition of curtain walling and glass balustrade on fourth floor front elevation (renewal of LA04/2021/1658/DCA) (amended description)

    Received 26 Feb, published by the council 22 Jul 2026 Heritage and listed buildings
  • Wilmont House, Sir Thomas and Lady Dixon Park, 243 Upper Malone Rd, Dunmurry, Belfast, BT17 9LA

    Enabling works for safe access and asbestos removal to allow condition survey to occur.

    Received 2 Jul, published by the council 6 Aug 2026 Heritage and listed buildings
  • 57 Fountain Street, Belfast, BT1 5EB

    Minor external and internal demolitions required to facilitate alterations to the shopfront and fenestration changes to north and west elevation (Amended Description)

    Received 23 Jul, published by the council 22 Jul 2026 Heritage and listed buildings
  • St. Patricks Church Of Ireland Newtownards Road, Ballymacarrett, Belfast, BT4 1GZ

    Single storey link building extension between the existing church and church hall; external landscaping works including children’s play area, fencing and access ramp. External alterations with new window / door openings and internal alterations to the church hall. Provision of an external bin storage area.

    Received 13 Feb, published by the council 22 Jul 2026 Heritage and listed buildings
  • 18-22 Castle Place, Belfast, BT1 1GB

    Proposed change of use from ground and first floor coffee shop to restaurant and takeaway including external alterations and associated external plant

    Received 13 Mar, published by the council 22 Jul 2026 Heritage and listed buildings