Planning application
Stewartby Church Hall Park Crescent Stewartby Bedford Bedfordshire MK43 9NL
Works: Demolition
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Demolition of existing annexe building to the rear of church hall
As published by the council, reference 26/00374/FUL
Application record
- Reference
- 26/00374/FUL
- Type
- Full Planning
- Status
- Awaiting decision
- Received
- 25 Feb 2026
- Validated
- 3 Jun 2026
- Ward
- Wixams & Wilstead
- Parish
- Stewartby
- Postcode
- MK43 9NL
Timeline
Dates from the published record
-
25 Feb 2026
Received by Bedford
-
3 Jun 2026
Validated
Checked as complete and ready for consideration.
-
19 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 29 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Bedford took a median of 55 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
14 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Bedford for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
15 Dapple Bank Stewartby Bedford Bedfordshire MK43 9SG
76% historically approved · decision due ~24 Aug
Certificate to confirm that the details submitted do not require planning permission (Loft conversion and internal alterations)
Decided Lawful development Loft or dormer -
73 Stewartby Way Stewartby Bedford MK43 9LL
Single storey side extension.
Granted Full applications Extension 5 docsSmall domestic -
42 Milton Crescent, Stewartby, Bedford, MK43 9SX
Proposed loft conversion and insertion of velux windows
Granted Full applications Loft or dormer Windows or glazing 7 docs -
Office Stewartby Village Hall Churchill Close Stewartby Bedford Bedfordshire MK43 9LU
76% historically approved · decision due ~17 Sep
Remove T1 (Field Maple). All works to accord with BS3998.
Decided Trees -
15 Stewartby Way Stewartby Bedford MK43 9LX
Demolition of outbuilding/garage. Erection of one and two storey side/rear extensions with garage and new dropped kerb to road. Discharge of condition 1 of planning permission 04/00568/FUL - (set back of two storey extension)
Granted Conditions Extension Demolition 3 docs
Other full applications applications
In Bedford
-
26/01695/FUL Awaiting decision
37 Green Lane Wixams Bedford Bedfordshire MK42 6DA
Demolition of conservatory and erection of a single storey side extension.
-
26/01689/FUL Awaiting decision
2 Cromwell Road Bedford Bedfordshire MK40 4LR
Change of Use of first floor to residential flat, including attic conversion with rear dormer, enabling the creation of a live-work unit.
-
26/01681/FUL Awaiting decision
33 - 35 St Peters Street Bedford Bedfordshire MK40 2PN
Formation of a patient set-down and pick-up facility, ancillary to the existing dental use (Use Class E), within the rear curtilage; comprising partial demolition of the rear boundary wall to form a new vehicular access from the rear service lane, one accessible (disabled) transfer bay and one set-down space with associated hardstanding and drainage, boundary treatment, cycle and refuse storage, and an electric vehicle charging point.
-
26/01684/FUL Awaiting decision
4 Miller Close Clapham Bedford Bedfordshire MK41 6GN
Roof to be raised with addition of rear box dormer to allow loft conversion
-
26/01677/FUL Awaiting decision
4 Blackberry Close Great Barford Bedford Bedford MK44 3FY
Insertion of 2 additional rooflights to existing 2nd floor and 2 windows to RH (North) elevation