Skip to content
PlanIndex Get alerts
Menu

Planning application

Ramgarhia Sikh Society 33 - 39 Ampthill Street Bedford Bedfordshire MK42 9BT

Awaiting decision Bedford 25/02471/FUL Full Planning

Works: Extension

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

One, two storey and first floor extensions and refurbishment of the existing Sri Gurdwara Sahib Ji (a long-established Class F1(f) Place of Worship).

As published by the council, reference 25/02471/FUL

Application record

Reference
25/02471/FUL
Type
Full Planning
Status
Awaiting decision
Received
11 Dec 2025
Validated
19 Dec 2025
Ward
Cauldwell
Parish
Bedford Town
Postcode
MK42 9BT

Timeline

Dates from the published record

  1. 11 Dec 2025

    Received by Bedford

  2. 19 Dec 2025

    Validated

    Checked as complete and ready for consideration.

  3. 19 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 13 February 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Bedford took a median of 55 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

106 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Bedford for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 15 Kingsway Bedford Bedfordshire MK42 9EZ

    21/00836/AOC Submitted 22 Mar 2021 138m away

    20/00450/CPNO - Condition 2 - Parking and Bins (Discharge of condition)

    Refused Conditions 9 docs
  • 70 St.Leonard's Street Bedford MK42 9EQ

    04/00183/FUL Submitted 2 Feb 2004 200m away

    Insertion of window.

    Granted Full applications Windows or glazing
  • 1A St Leonards Avenue Bedford Bedfordshire MK42 0RB

    26/00949/TELLN Submitted 18 May 2026 208m away

    Removal of pole from outside 1 St Leonards Ave and replacement with 9m pole outside no 1A. (In accordance with Regulation 5 of the Electronic Communications Code (Conditions and Restrictions) Regulations 2003 (as amended) and Class A Part 16 of Schedule 2 of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended)) This is a notification only to the Local Authority who have no determining powers.)

    Granted Telecoms 2 docs
  • Flat A 44 St Leonards Avenue Bedford Bedfordshire MK42 0RB

    26/01253/TPO Submitted 2 Jul 2026 212m away

    76% historically approved · decision due ~27 Aug

    X3 Lime Trees - Re pollard back to their previous pollarding points, approximate reduction of 3/4 metres.

    Decided Trees
  • Express By Holiday Inn Wilstead Road Elstow Bedford Bedfordshire MK42 9BB

    26/01682/SPNJ Submitted 1 Sep 2026 229m away

    76% historically approved · decision due ~27 Oct

    Prior notification for the installation, alteration or replacement on non-domestic properties of (a) micro-generation solar thermal equipment; (b) micro-generation solar PV equipment; or (c) other solar PV equipment on the roof. This is not a planning application because it relates to development that is permitted by Government Regulation. It will not therefore be reported to the Planning Committee but considered by officers under delegated powers. Comments received will be considered but if notification of a decision is not made to the Applicant within 56 days of the date of registration of the proposal, it can proceed.

    Awaiting decision
  • Longmarsh Ltd Elstow Road Bedford Bedfordshire MK42 9LE

    23/00136/TELLN Submitted 20 Jan 2023 331m away

    The Electronic Communications Code (Conditions and restrictions) (Amendment) Regulations 2017 - The removal of 6 no. existing antennas to be replaced with 6 no. antennas. The installation of 2 no. 300mm dishes. Ancillary development thereto including removal of existing 6no. Remote Radio Units (RRU's) and installation of 15 no. Remote Radio Units (RRU's) and 1 no. GPS module. (This is a notification only to the Local Authority who have no determining powers)

    Decided Telecoms 5 docs

In Bedford

  • 26/01695/FUL Awaiting decision

    37 Green Lane Wixams Bedford Bedfordshire MK42 6DA

    Demolition of conservatory and erection of a single storey side extension.

    3 Sep 2026 Full applications
  • 26/01689/FUL Awaiting decision

    2 Cromwell Road Bedford Bedfordshire MK40 4LR

    Change of Use of first floor to residential flat, including attic conversion with rear dormer, enabling the creation of a live-work unit.

    2 Sep 2026 Full applications
  • 26/01681/FUL Awaiting decision

    33 - 35 St Peters Street Bedford Bedfordshire MK40 2PN

    Formation of a patient set-down and pick-up facility, ancillary to the existing dental use (Use Class E), within the rear curtilage; comprising partial demolition of the rear boundary wall to form a new vehicular access from the rear service lane, one accessible (disabled) transfer bay and one set-down space with associated hardstanding and drainage, boundary treatment, cycle and refuse storage, and an electric vehicle charging point.

    1 Sep 2026 Full applications
  • 26/01684/FUL Awaiting decision

    4 Miller Close Clapham Bedford Bedfordshire MK41 6GN

    Roof to be raised with addition of rear box dormer to allow loft conversion

    1 Sep 2026 Full applications
  • 26/01677/FUL Awaiting decision

    4 Blackberry Close Great Barford Bedford Bedford MK44 3FY

    Insertion of 2 additional rooflights to existing 2nd floor and 2 windows to RH (North) elevation

    31 Aug 2026 Full applications