Planning application
64 Phillpotts Avenue Bedford Bedfordshire MK40 3UD
Works: Extension Loft or dormer Demolition Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Demolition of existing conservatory structure and erection of single storey extension along with loft conversion including hip to gable roof extension and rear dormer.
As published by the council, reference 22/02434/FUL
Application record
- Reference
- 22/02434/FUL
- Type
- Full Planning
- Status
- Decided - Permitted
- Decision
- Grant Permission
- Received
- 7 Nov 2022
- Validated
- 8 Nov 2022
- Decided
- 30 Dec 2022
- Ward
- Castle & Newnham
- Parish
- Bedford Town
- Decision by
- Officers (Delegated)
- Postcode
- MK40 3UD
Timeline
Dates from the published record
-
7 Nov 2022
Received by Bedford
-
8 Nov 2022
Validated
Checked as complete and ready for consideration.
-
30 Dec 2022
Decision issued: Grant Permission
-
19 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
76 Phillpotts Avenue Bedford Bedfordshire MK40 3UD
83% historically approved · decision due ~29 Jul
Loft conversion with rear dormer.
Awaiting decision Full applications Loft or dormer -
76 Phillpotts Avenue Bedford Bedfordshire MK40 3UD
Certificate to confirm that the details submitted do not require planning permission. (Loft conversion)
Granted Lawful development Loft or dormer 8 docs -
42 Newnham Avenue Bedford Bedfordshire MK41 9PT
83% historically approved · decision due ~7 Jul
One and two storey rear extension and loft conversion
Awaiting decision Full applications Extension Loft or dormer 12 docs -
24 Phillpotts Avenue Bedford Bedfordshire MK40 3UF
Removal of existing out-shut and conservatory and erection of single storey rear extension
Granted Full applications Extension 9 docsSmall domestic -
3 George Street Bedford Bedfordshire MK40 3RY
83% historically approved · decision due ~9 Jun
Roof Alterations to create loft with full width dormer, Juliet balcony to rear and velux window to the street elevation.
Awaiting decision Full applications Loft or dormer Roofing +1 20 docs -
11 Beresford Road Bedford Bedford MK40 3SD
76% historically approved · decision due ~31 Aug
Prior notification for single storey rear extension(s) between 3 and 6 metres depth. This is not a planning application because it relates to development that is permitted by Government Regulation. It will not therefore be reported to the Planning Committee but considered by officers under delegated powers. Only objections from adjoining neighbours can be considered.
Decided ExtensionSmall domestic
Other full applications applications
In Bedford
-
26/01695/FUL Awaiting decision
37 Green Lane Wixams Bedford Bedfordshire MK42 6DA
Demolition of conservatory and erection of a single storey side extension.
-
26/01689/FUL Awaiting decision
2 Cromwell Road Bedford Bedfordshire MK40 4LR
Change of Use of first floor to residential flat, including attic conversion with rear dormer, enabling the creation of a live-work unit.
-
26/01681/FUL Awaiting decision
33 - 35 St Peters Street Bedford Bedfordshire MK40 2PN
Formation of a patient set-down and pick-up facility, ancillary to the existing dental use (Use Class E), within the rear curtilage; comprising partial demolition of the rear boundary wall to form a new vehicular access from the rear service lane, one accessible (disabled) transfer bay and one set-down space with associated hardstanding and drainage, boundary treatment, cycle and refuse storage, and an electric vehicle charging point.
-
26/01684/FUL Awaiting decision
4 Miller Close Clapham Bedford Bedfordshire MK41 6GN
Roof to be raised with addition of rear box dormer to allow loft conversion
-
26/01677/FUL Awaiting decision
4 Blackberry Close Great Barford Bedford Bedford MK44 3FY
Insertion of 2 additional rooflights to existing 2nd floor and 2 windows to RH (North) elevation