Skip to content
PlanIndex Get alerts
Menu

Planning application

19 Nelson Street Bedford Bedfordshire MK40 4JP

Granted Bedford 21/00092/FUL Full Planning

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey rear/side extension

As published by the council, reference 21/00092/FUL

Application record

Reference
21/00092/FUL
Type
Full Planning
Status
Decided - Permitted
Decision
Grant Permission
Received
13 Jan 2021
Validated
19 Jan 2021
Decided
6 May 2021
Ward
Queens Park
Parish
Bedford Town
Decision by
Officers (Delegated)
Postcode
MK40 4JP

Timeline

Dates from the published record

  1. 13 Jan 2021

    Received by Bedford

  2. 19 Jan 2021

    Validated

    Checked as complete and ready for consideration.

  3. 6 May 2021

    Decision issued: Grant Permission

  4. 19 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • West End Community Centre 84 Ford End Road Bedford MK40 4JX

    04/00844/AOC Submitted 17 Mar 2004 178m away

    Erection of Gurdwara (place of worship) and relocation of car parking area to the rear - discharge of condition 4 of planning permission 03/02928/FUL - drainage.

    Granted Conditions
  • West End Community Centre 84 Ford End Road Bedford MK40 4JX

    04/00845/AOC Submitted 17 Mar 2004 178m away

    Erection of Gurdwara (place of worship) and relocation of car parking area to the rear - discharge of condition 6 of planning permission 03/02928/FUL - materials.

    Granted Conditions
  • West End Community Centre 84 Ford End Road Bedford MK40 4JX

    04/00847/AOC Submitted 17 Mar 2004 178m away

    Erection of Gurdwara (place of worship) and relocation of car parking to the rear - discharge of condition 7 of planning permission 03/02928/FUL - slab levels.

    Granted Conditions 2 docs
  • 19 Honey Hill Road Bedford Bedfordshire MK40 4NN

    21/03313/FUL Submitted 21 Dec 2021 179m away

    Single storey rear/side extension with alterations to the ground floor rear roof.

    Granted Full applications Extension 8 docs
    Small domestic
  • 19 Honey Hill Road Bedford Bedfordshire MK40 4NN

    21/02996/FUL Submitted 11 Nov 2021 179m away

    Single storey rear/side extension

    Withdrawn Full applications Extension 8 docs
    Small domestic
  • 2 Cromwell Road Bedford Bedfordshire MK40 4LR

    26/01689/FUL Submitted 2 Sep 2026 219m away

    83% historically approved · decision due ~28 Oct

    Change of Use of first floor to residential flat, including attic conversion with rear dormer, enabling the creation of a live-work unit.

    Awaiting decision Full applications Loft or dormer

In Bedford

  • 26/01695/FUL Awaiting decision

    37 Green Lane Wixams Bedford Bedfordshire MK42 6DA

    Demolition of conservatory and erection of a single storey side extension.

    3 Sep 2026 Full applications
  • 26/01689/FUL Awaiting decision

    2 Cromwell Road Bedford Bedfordshire MK40 4LR

    Change of Use of first floor to residential flat, including attic conversion with rear dormer, enabling the creation of a live-work unit.

    2 Sep 2026 Full applications
  • 26/01681/FUL Awaiting decision

    33 - 35 St Peters Street Bedford Bedfordshire MK40 2PN

    Formation of a patient set-down and pick-up facility, ancillary to the existing dental use (Use Class E), within the rear curtilage; comprising partial demolition of the rear boundary wall to form a new vehicular access from the rear service lane, one accessible (disabled) transfer bay and one set-down space with associated hardstanding and drainage, boundary treatment, cycle and refuse storage, and an electric vehicle charging point.

    1 Sep 2026 Full applications
  • 26/01684/FUL Awaiting decision

    4 Miller Close Clapham Bedford Bedfordshire MK41 6GN

    Roof to be raised with addition of rear box dormer to allow loft conversion

    1 Sep 2026 Full applications
  • 26/01677/FUL Awaiting decision

    4 Blackberry Close Great Barford Bedford Bedford MK44 3FY

    Insertion of 2 additional rooflights to existing 2nd floor and 2 windows to RH (North) elevation

    31 Aug 2026 Full applications