Skip to content
PlanIndex Get alerts
Menu

Planning application

189 Bradford Road, Combe Down, Bath, Bath And North East Somerset, BA2 5BT

Granted Bath and North East Somerset 26/02944/FUL Full Application

Works: Loft or dormer

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Conversion of existing roof space to habitable accommodation including the installation of two front rooflights and one rear dormer, internal alterations insertion of a soil vent pipe and associated external works.

As published by the council, reference 26/02944/FUL

Application record

Reference
26/02944/FUL
Type
Full Application
Status
Application Permitted
Decision
Granted As published: PERMIT
Received
5 Aug 2026
Validated
5 Aug 2026
Decided
28 Sep 2026
Ward
Combe Down
Decision by
Delegated
Postcode
BA2 5BT

Site history

Applications at this address on the Bath and North East Somerset register

This site has had 2 applications since 2025: 2 approved, 0 refused.

  • 25/04626/FUL Granted

    189 Bradford Road, Combe Down, Bath, Bath And North East Somerset, BA2 5BT

    Erection of single storey rear extensions and timber garden structures in rear garden for No.s 189 & No191 Bradford Road, following demolition of existing garages/shed structures.

    Decided 6 Feb 2026 Full applications

Timeline

Dates from the published record

  1. 5 Aug 2026

    Received by Bath and North East Somerset

  2. 15 Aug 2026

    Added to PlanIndex

  3. 22 Sep 2026

    Status changed to Pending Decision

    Previously Pending Consideration.

  4. 28 Sep 2026

    Decision issued: PERMIT

Documents

Plans, drawings, consultee responses and the officer's report

Documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Bath and North East Somerset granted permission on 28 September 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Bath and North East Somerset

  • 26/02627/FUL Granted

    40 Bathwick Hill, Bathwick, Bath, Bath And North East Somerset, BA2 6LD

    Change of use from two dwellings (40 Bathwick Hill and The Wing, 40 Bathwick Hill) to a single dwelling.

    Received 10 Jul, published by the council 31 Jul 2026 Full applications
  • 26/03127/FUL Granted

    Croquet Lawns, Bath Recreation Ground, Pulteney Mews, Bathwick, Bath, Bath And North East Somerset,

    Installation of Water Storage Tank and gated fencing as screen

    Received 18 Aug, published by the council 2 Sep 2026 Full applications
  • 26/02134/FUL Granted

    Rosebank , Common Lane, Compton Dando, Bristol, Bath And North East Somerset, BS39 4JU

    Erection of a two storey side extension, following the removal and demolition of the existing conservatory, and the erection of a single storey rear extension.

    Received 3 Jun, published by the council 21 Jul 2026 Full applications
  • 26/02736/FUL Granted

    Thornton House , Bristol Road, Farrington Gurney, Bristol, Bath And North East Somerset, BS39 6TQ

    Erection of Single storey rear extension with balcony and single storey side extension with dormers to form 3 bay garage with bedroom above. Replace existing front boundary wall with new 1.8m high wall and new gates to existing in/out access points

    Received 21 Jul, published by the council 31 Jul 2026 Full applications
  • 25/03989/FUL Granted

    Greenwoods , 50 Cleveland Walk, Bathwick, Bath, Bath And North East Somerset, BA2 6JT

    Removal of hipped roof and construction of parapet roof. Alterations to fenestrations including enlargement of windows and installation of bifold doors and replacement of softwood windows with composite windows. New access bridge to rear.

    Received 14 Oct, published by the council 21 Jul 2026 Full applications