Planning application
Techniglaze Ltd, 48 First Avenue, Westfield, Bath And North East Somerset,
Works: Extension
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Variation of condition 10 (Plans List) of application 25/00554/FUL (Erection of extension to existing factory (Unit D)).
As published by the council, reference 25/03563/VAR
Application record
- Reference
- 25/03563/VAR
- Type
- Application for Variation of Condition
- Status
- Application Permitted
- Decision
- Granted As published: PERMIT
- Received
- 10 Sep 2025
- Validated
- 10 Sep 2025
- Decided
- 27 Oct 2025
- Ward
- Westfield
- Parish
- Westfield
- Decision by
- Delegated
Site history
Applications at this address on the Bath and North East Somerset register
This site has had 3 applications since 2025: 3 approved, 0 refused.
-
26/00264/COND Granted
Techniglaze Ltd, 48 First Avenue, Westfield, Bath And North East Somerset,
Discharge of condition 5 (name of the condition) of application 25/00554/FUL (Erection of extension to existing factory (Unit D))
-
25/03446/COND Granted
Techniglaze Ltd, 48 First Avenue, Westfield, Bath And North East Somerset,
Discharge of conditions 2 (Wildlife Protection and Enhancement Scheme (Pre-commencement)) 4 (Biodiversity Net Gain Plan (Pre-commencement)) and 8 (details of wheel washing facilities and a parking plan) of application 25/00554/FUL (Erection of extension to existing factory (Unit D))
Timeline
Dates from the published record
-
10 Sep 2025
Received by Bath and North East Somerset
-
27 Oct 2025
Decision issued: PERMIT
-
21 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
Documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Bath and North East Somerset granted permission on 27 October 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Techniglaze Ltd, 48 First Avenue, Westfield, Bath And North East Somerset,
Discharge of conditions 2 (Wildlife Protection and Enhancement Scheme (Pre-commencement)) 4 (Biodiversity Net Gain Plan (Pre-commencement)) and 8 (details of wheel washing facilities and a parking plan) of application 25/00554/FUL (Erection of extension to existing factory (Unit D))
Granted Conditions Extension -
Techniglaze Ltd, 48 First Avenue, Westfield, Bath And North East Somerset,
Discharge of condition 5 (name of the condition) of application 25/00554/FUL (Erection of extension to existing factory (Unit D))
Granted Conditions Extension -
Unit 3a, St Peter's Park, Cobblers Way, Westfield, Bath And North East Somerset, BA3 3BX
Change of use of Unit 3A from a use within Use Class E (g) to use as a tattoo and cosmetic beauty treatment studio.
Granted Full applications 8 docs -
Oval Estates (bath) Ltd, The Oval Office, Cobblers Way, Westfield, Radstock, Bath And North East Somerset, BA3 3BX
Prior approval request for change of use from offices (Use Class B1) to 13no. flats (Use Class C3).
Refused Outline New dwelling 10 docsMajor scheme -
Parcel 6781 Development Site, Cobblers Way, Westfield, Bath And North East Somerset,
Discharge condition 13 of application 14/04003/OUT (Outline planning application (all matters reserved aside from access) seeking permission for 81 no. residential dwellings and associated works on land at the former St Peter's Factory, Cobblers Way, Westfield, Radstock.)
Split decision Conditions 4 docs -
31 Lincombe Road, Westfield, Radstock, Bath And North East Somerset, BA3 3YJ
Works to conservatory (Certificate of Lawful Proposed Use)
Withdrawn Lawful development Extension 23 docs
Other amendment applications
In Bath and North East Somerset
-
26/02667/REM Granted
Land West Of 1, Townsend, East Harptree, Bristol, Bath And North East Somerset,
Removal of condition 2 (Off Site Biodiversity Gain Proposals) of application 24/00010/FUL (Erection of three-bedroom detached house with on-site parking for 2 vehicles and bikes).
-
26/02156/VAR Granted
Lyncombe Court , Lyncombe Vale Road, Lyncombe, Bath, Bath And North East Somerset, BA2 4LR
Variation of condition 6 (Plans List) of 22/02995/FUL (Proposal to utilise the building (upper and lower ground level) as a guest cottage with a proposed lean-to extension on the northern gable end on upper ground floor level carefully positioned in the location of an older 'extension' to the outbuilding; together with minor alterations).
-
26/02655/VAR Granted
1 Westerleigh Villas , Bath Road, Peasedown St John, Bath, Bath And North East Somerset, BA2 8DS
Variation of condition 6 (Plans List) of application 25/02024/FUL (Erection of a semi-detached dwelling with parking provisions following demolition of existing garage.)
-
26/03110/NMA Granted
Wellow Trekking Centre, Little Horse Croft Farm, Ford Road, Wellow, Bath, Bath And North East Somerset, BA2 8QF
Non Material Amendment to application 25/00727/FUL (Full Planning Application for Demolition of existing dwelling and indoor riding arena and the provision of 3 no. new dwellings (Use Class C3), redevelopment of existing cafe and provision of further parking and proposed footpath link).
-
26/01877/NMA Granted
11 Lambridge Place, Lambridge, Bath, Bath And North East Somerset, BA1 6RU
Non Material Amendment to application 22/02088/FUL (Erection of two single-storey rear extensions at ground and lower ground floor level following removal of existing shed; Installation of solar thermal panel on roof, thermal store and heat pump in rear garden; Internal and external alterations to including insulating and lining roof slopes, movement of studwork partitions, raising the third floor bedroom ceilings, introduction of an entrance lobby as a result of the installation of a new door and upgrading the existing windows with secondary timber sash glazing. Various environmental improvements including the replacement of gas boiler with an air-source heat pump).