Skip to content
PlanIndex Get alerts
Menu

Planning application

Parcel 0018, Northend Lane, Clutton, Bristol, Bath And North East Somerset,

Granted Bath and North East Somerset 21/02639/REG03 Regulation 3 Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Creation of new field access gateway (approx. 180m south on A37) identical to existing, with 3m x 1.1m galvanised metal 5-bar gate and the reduction of the existing gateway to the kissing gate to continue the use of the Public Right of Way

As published by the council, reference 21/02639/REG03

Application record

Reference
21/02639/REG03
Type
Regulation 3 Application
Status
Application Permitted
Decision
Granted As published: PERMIT
Received
3 Jun 2021
Validated
23 Jun 2021
Decided
9 Aug 2021
Ward
Clutton And Farmborough
Parish
Clutton
Decision by
Delegated

Timeline

Dates from the published record

  1. 3 Jun 2021

    Received by Bath and North East Somerset

  2. 23 Jun 2021

    Validated

    Checked as complete and ready for consideration.

  3. 9 Aug 2021

    Decision issued: PERMIT

  4. 4 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

20 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Bath and North East Somerset granted permission on 9 August 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About less common application types

This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.

In Bath and North East Somerset

  • 26/03558/REG03 Awaiting decision

    Joules , 12 Northgate Street, City Centre, Bath, Bath And North East Somerset, BA1 5AS

    Modification of the existing ANPR camera installation on the front elevation of the property to include a wireless point-to-multipoint terminal unit and associated mounting equipment.

    Received 16 Sep, published by the council 6 Oct 2026 Other
  • 26/02250/REG03 Granted

    Bath Tourism Bureau, Abbey Chambers, Kingston Parade, City Centre, Bath, Bath And North East Somerset, BA1 1LY

    Temporary change of use of the highways and various public open spaces within Bath city centre for an annual Christmas Market in November and December each year.

    Received 11 Jun, published by the council 21 Jul 2026 Other
  • 26/03276/DEM Awaiting decision

    Culverhay Sports Centre, Bath Spa University Rush Hill Campus, Rush Hill, Odd Down, Bath, Bath And North East Somerset, BA2 2QL

    Demolition of existing C20 built campus and assosciated hardstanding.

    Received 27 Aug, published by the council 13 Sep 2026 Other
  • 26/03279/REG03 Awaiting decision

    Culverhay Sports Centre, Bath Spa University Rush Hill Campus, Rush Hill, Odd Down, Bath, Bath And North East Somerset, BA2 2QL

    Erection of bat mitigation building

    Received 27 Aug, published by the council 22 Sep 2026 Other
  • 26/01746/REG03 Granted

    66A Walcot Street, City Centre, Bath, Bath And North East Somerset, BA1 5BD

    Improvements to fire compartmentation against adjoining property, minor repairs to stonework, inspection and associated works to roof, installation of rear gates to the property, removal of paint finish to ground and lower ground floor masonry. Demolition of unauthorised rear extension and removal of unauthorised front sign boards

    Received 6 May, published by the council 21 Jul 2026 Other