Archive · Basingstoke and Deane · 2024
Planning applications in Basingstoke and Deane, September 2024
Page 3 of 3, newest first. Back to the first page for September 2024.
Applications, September 2024
Newest first ยท page 3 of 3
-
24/02057/RET Withdrawn
1 Poveys Cottages Lane To Poveys Farm Stoney Heath Baughurst Hampshire RG26 5SN
Erection of a gazebo and laying of paving
-
T/00437/24/TCA Granted
St Marys Church Swan Street Kingsclere Newbury Hampshire RG20 5PJ
Yew tree: removal of lowest limb overhanging carriageway and sever Ivy on main trunk.
-
24/02024/LDPO Refused
Slade Hill Cottage Station Road Slade Hill Woolton Hill Hampshire RG20 9TN
Certificate of lawful development for the construction of an oak timber framed car port with pitched roof
-
24/02023/GPDSP Granted
Tadley Swimming Pool New Road Tadley Hampshire RG26 3LA
Application for prior approval for the installation of 137 no. 525w PV Solar Panels to south west facing roof
-
24/02025/HSE Granted
The Old Post Office King Johns Lane Herriard Hampshire RG25 2PN
Proposed ground floor rear extension, internal alterations and all associated works
-
24/02015/FUL Granted
Daneshill School Bylands Lane Stratfield Turgis Hampshire RG27 0AR
Erection of a replacement drama building
-
T/00432/24/TPO Granted
5 Penwood Heights Penwood Highclere Newbury Hampshire RG20 9EY
Silver Birch T1: Remove one lower limb.
-
24/02006/HSE Withdrawn
2 The Old Forge Dummer Basingstoke Hampshire RG25 2AG
Erection of a first floor extension and alterations to external finishes
-
24/02014/HSE Granted
Brickworks Cottage Monk Sherborne Road Ramsdell Tadley Hampshire RG26 5PR
Erection of single storey side extension
-
24/02008/HSE Granted
3 Ramsholt Close North Waltham Hampshire RG25 2DG
Installation of Air Source Heat Pump, for heating and cooling of property. Introduction of decking to rear garden of property.
-
24/02004/LBC Granted
Portal Hall Church Lane Burghclere Hampshire RG20 9HX
Renovation of existing original cast iron Hoppers and replacement of existing defective cast iron gutters and fixings with new deep flow cast aluminium gutters to match existing.
Other months in 2024
- January 2024 6
- February 2024 9
- March 2024 11
- April 2024 7
- May 2024 21
- June 2024 24
- July 2024 59
- August 2024 114
- September 2024 111
- October 2024 133
- November 2024 82
- December 2024 11