Planning application
Gemini Centre Hamilton Close Basingstoke Hampshire RG21 6YT
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Installation of 2 No. new GRP enclosures to form Gas Bottle Cylinder stores. 2 No. Concrete plinths.
As published by the council, reference 26/01577/FUL
Application record
- Reference
- 26/01577/FUL
- Type
- Full Planning Application
- Status
- Registered
- Received
- 31 Jul 2026
- Validated
- 3 Aug 2026
- Ward
- Norden
- Postcode
- RG21 6YT
Timeline
Dates from the published record
-
31 Jul 2026
Received by Basingstoke and Deane
-
3 Aug 2026
Validated
Checked as complete and ready for consideration.
-
16 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 28 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Basingstoke and Deane took a median of 51 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in Altrincham
19 applications on PlanIndex · across 14 councils
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Basingstoke and Deane for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Ashwood Education Centre Ashwood Way Basingstoke Hampshire RG23 8AA
Demolition of all existing school buildings within the site and replacement with the following: new sports hall, Multi-Use Games Area, two storey teaching accommodation and associated landscaping and infrastructure improvements
Granted Full applications Demolition 75 docs -
Andy Shore Garage Winklebury Way Basingstoke RG23 8BB
Proposed hand car wash
Refused Full applications 10 docs -
Omoda Basingstoke Edison Road Basingstoke Hampshire RG21 6YH
Display of 1 no. Illuminated 6m Omoda totem
Granted Advertising 8 docs -
Mercedes Benz Of Basingstoke Edison Road Basingstoke Hampshire RG21 6YH
Display of 2 no. internally illuminated fascia signs. Fabricated 196mm deep aluminium back box with digitally printed flex-face canvas. The printed display is blue with a white grid pattern. The display is internally illuminated by white LEDS - white grid only to illuminate, blue elements do not illuminate. Illumination levels not exceeding 500cd/m.
Granted Advertising 12 docs -
Snows Motor Holdings Ltd Brunel Road Basingstoke Hampshire RG21 6XQ
Display of 10 no. various illuminated and non illuminated signs
Granted Advertising 8 docs -
10 Hazelwood Close Basingstoke Hampshire RG23 8LD
Two storey side extension following demolition of existing garage and utility
Granted Householder Extension Demolition 14 docsDomestic
Other full applications applications
In Basingstoke and Deane
-
26/00918/FUL Granted
Units 17 And 18 Lister Road Industrial Estate Sherrington Way Basingstoke Hampshire RG22 4DQ
Change of use from Class B8 to Class B2 (General Industrial) use for units 17 and 18
-
26/01759/FUL Awaiting decision
Park House Stables Winchester Road Kingsclere Hampshire RG20 5PY
Removal of existing stable building and replacement with two new buildings serving as office, welfare facilities, client space and cricket pavilion. To include associated landscaping works and connection to the existing drainage system.
-
26/01751/FUL Awaiting decision
Oakridge Methodist Church Vivian Road Basingstoke Hampshire RG21 5QB
Siting of a temporary shipping container for storage purposes.
-
25/02621/FUL Granted
Monts Farm Browninghill Browninghill Green Baughurst Hampshire RG26 5JZ
Change of Land Use from Equestrian to Residential together with construction of one five bed detached dwelling house with detached carport and access driveway. Installation of air source heat pump.
-
26/01746/FUL Awaiting decision
12 And 13 Bilton Industrial Estate Bilton Road Basingstoke Hampshire RG24 8NJ
Conversion of units 12 and 13 to form 1 unit, together with refurbishment works including roof replacement; installation of new and redecoration of existing cladding; replacement of windows and doors; installation of photovoltaic (PV) panels and electric vehicle (EV) charging points; replacement of external air-conditioning units; and the removal of existing tenant installations.