Planning application
Land At OS Ref 460776 158797 Plot 2 Ramsdell Road Pamber End Hampshire
Works: New dwelling Domestic
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Construction of one self build dwelling, access on to the highway and associated landscaping
As published by the council, reference 26/00891/FUL
Application record
- Reference
- 26/00891/FUL
- Type
- Full Planning Application
- Status
- Awaiting decision
- Received
- 30 Apr 2026
- Validated
- 11 May 2026
- Ward
- Tadley & Pamber
- Parish
- PAMBER CP
Timeline
Dates from the published record
-
30 Apr 2026
Received by Basingstoke and Deane
-
11 May 2026
Validated
Checked as complete and ready for consideration.
-
25 Jul 2026
Added to PlanIndex
-
5 Sep 2026
Status changed to Awaiting decision
Previously Registered.
-
Decision
Awaiting decision
Decision expected by 6 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Basingstoke and Deane took a median of 51 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Hook
406 applications on PlanIndex · across 50 councils · 77% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
19 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Basingstoke and Deane for determination, against a statutory target of eight weeks. Over the last year Basingstoke and Deane decided full applications in a median of 90 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Basingstoke and Deane
-
26/00918/FUL Granted
Units 17 And 18 Lister Road Industrial Estate Sherrington Way Basingstoke Hampshire RG22 4DQ
Change of use from Class B8 to Class B2 (General Industrial) use for units 17 and 18
-
26/01759/FUL Awaiting decision
Park House Stables Winchester Road Kingsclere Hampshire RG20 5PY
Removal of existing stable building and replacement with two new buildings serving as office, welfare facilities, client space and cricket pavilion. To include associated landscaping works and connection to the existing drainage system.
-
26/01751/FUL Awaiting decision
Oakridge Methodist Church Vivian Road Basingstoke Hampshire RG21 5QB
Siting of a temporary shipping container for storage purposes.
-
25/02621/FUL Granted
Monts Farm Browninghill Browninghill Green Baughurst Hampshire RG26 5JZ
Change of Land Use from Equestrian to Residential together with construction of one five bed detached dwelling house with detached carport and access driveway. Installation of air source heat pump.
-
26/01746/FUL Awaiting decision
12 And 13 Bilton Industrial Estate Bilton Road Basingstoke Hampshire RG24 8NJ
Conversion of units 12 and 13 to form 1 unit, together with refurbishment works including roof replacement; installation of new and redecoration of existing cladding; replacement of windows and doors; installation of photovoltaic (PV) panels and electric vehicle (EV) charging points; replacement of external air-conditioning units; and the removal of existing tenant installations.