Skip to content
PlanIndex Get alerts
Menu

Planning application

Meade Barn The Street Bramley Hampshire RG26 5DD

Granted Basingstoke and Deane 26/00127/HSE Householder Permission

Works: Windows or glazing Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Conversion of existing garage to living accommodation including replacement of garage door with window, and replacement of external doors and all existing windows.

As published by the council, reference 26/00127/HSE

Application record

Reference
26/00127/HSE
Type
Householder Permission
Status
Decided
Decision
Granted
Received
23 Jan 2026
Validated
23 Jan 2026
Decided
2 Apr 2026
Ward
Bramley
Parish
BRAMLEY CP
Decision by
Delegated
Postcode
RG26 5DD

Timeline

Dates from the published record

  1. 23 Jan 2026

    Received by Basingstoke and Deane

  2. 2 Apr 2026

    Decision issued: Granted

  3. 25 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Nigel Rose Architects Agent, an architecture practice

102 applications on PlanIndex · across 13 councils · 77% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

19 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Basingstoke and Deane granted permission on 2 April 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About householder applications

Householder applications cover work to an existing house and its garden, such as extensions, lofts and outbuildings, and cannot create a separate dwelling or change what the building is used for. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Hafod The Street Bramley Tadley Hampshire RG26 5DD

    T/00026/23/TCA Submitted 13 Jan 2023 0m away

    Tree 1: crown reduce and reshape as per photograph.

    Granted Trees 1 doc
  • Middle Farm The Street Bramley Hampshire RG26 5DD

    25/02437/LBC Submitted 9 Oct 2025 0m away

    96% historically approved · decision due ~4 Dec

    Erection of replacement porch to front; erection of replacement porch to rear with pergola; Increase size of existing aperture to Living room to allow for installation of new doors to rear. Replacement door

    Awaiting decision Heritage and listed buildings Extension 17 docs
    Small domestic
  • Middle Farm The Street Bramley Hampshire RG26 5DD

    25/02436/HSE Submitted 9 Oct 2025 0m away

    98% historically approved · decision due ~4 Dec

    Erection of replacement porch to front; erection of replacement porch to rear with pergola; Increase size of existing aperture to Living room to allow for installation of new doors to rear.

    Awaiting decision Householder Extension 17 docs
    Small domestic
  • The Firs 2 Churchlands Bramley Hampshire RG26 5DU

    T/00494/25/TCA Submitted 30 Sep 2025 106m away

    T1 & T2 Ash, Mature, multi stemmed trees forming one symbiotic canopy. Old Coppice trees at boundary line, previously pollard at 8m with 12m extension growth to remove from the pollard points. Re-pollard down to previous points at 8m. Remove all lateral growth to leave as monoliths. T3 Box Elder, previously pollard at 6m with 8m of extension growth from the pollard points to remove from the pollard points Reduce and reshape tree by 1/3 to form a new smaller well-balanced canopy. T4 Rowan tree (dead), Dismantle to lowest level. Works to be carried out in accordance with BS3998(2010), nearest best practice pruning points.

    Granted Trees 4 docs
  • 4 Churchlands Bramley Hampshire RG26 5DU

    T/00551/22/TPO Submitted 23 Dec 2022 127m away

    Tree works to include pruning and felling.

    Granted Trees 7 docs
  • Middle Farm Cottage The Street Bramley Hampshire RG26 5DD

    T/00552/22/TPO Submitted 23 Dec 2022 159m away

    T12 - Oak (T19 of TPO TTP/BDB/0130) Crown clean removing any dead dangerous or broken / hanging / dysfunctional branches back to healthy growth. Timescale: 08-Jun-2023 (6 Months) Reason: To avoid branches falling and address a foreseeable health and safety concern

    Granted Trees 6 docs

In Basingstoke and Deane

  • 26/01391/HSE Granted

    9 Kingsbridge Copse Newnham Hampshire RG27 9AP

    Replacement roof and windows to garden room and part single storey extension to square off south-west corner. Alterations to fenestration

    7 Jul 2026 Householder
  • 26/01365/HSE Granted

    Flint Cottage Crown Lane Old Basing Hampshire RG24 7DN

    Various landscaping works, including the replacement and installation of additional fence panels, regrading of ground levels, construction of new patio areas, and associated planting and the installation of an Electric Vehicle (EV) charger to the garage

    2 Jul 2026 Householder
  • 26/00912/HSE Granted

    2 New Wooldings Farm Bungalows Kingsclere Road Whitchurch Hampshire RG28 7QB

    Demolition of existing garage and erection of detached garage

    5 May 2026 Householder
  • 26/01317/HSE Granted

    2 Yew Tree Close Bramley Hampshire RG26 5UQ

    Proposed first floor side extension

    26 Jun 2026 Householder
  • 26/01214/HSE Granted

    Brambles Clappsgate Road Pamber Heath Tadley Hampshire RG26 3EJ

    Erection of detached granny annexe.

    11 Jun 2026 Householder