Skip to content
PlanIndex Get alerts
Menu

Planning application

Land At Wadwick Bottom Elm Farm Wadwick Bottom Wadwick Hampshire

Granted Basingstoke and Deane 25/02723/FUL Full Planning Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Stationing of one mobile poultry shed and feed silo on agricultural land and extension of farm track

As published by the council, reference 25/02723/FUL

Application record

Reference
25/02723/FUL
Type
Full Planning Application
Status
Decided
Decision
Granted
Received
12 Nov 2025
Validated
27 Nov 2025
Decided
25 Feb 2026
Ward
Evingar
Parish
ST MARY BOURNE CP
Decision by
Delegated

Timeline

Dates from the published record

  1. 12 Nov 2025

    Received by Basingstoke and Deane

  2. 27 Nov 2025

    Validated

    Checked as complete and ready for consideration.

  3. 25 Feb 2026

    Decision issued: Granted

  4. 25 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

1 later application on the register refers to this one:

  • 26/00579/CONBGP Granted

    Land At Wadwick Bottom Wadwick Bottom Wadwick Hampshire

    Details pursuant to discharge Biodiversity Net Gain condition under paragraph 13 of Schedule 7A of the Town and Country Planning Act 1990 for planning permission 25/02723/FUL

    Decided 10 Apr 2026

Who's behind it

Company information only, from the register and Companies House

Agent on file, a planning consultancy registered in Devizes

17 applications on PlanIndex · across 5 councils · 100% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

30 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Basingstoke and Deane granted permission on 25 February 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In Basingstoke and Deane

  • 26/00918/FUL Granted

    Units 17 And 18 Lister Road Industrial Estate Sherrington Way Basingstoke Hampshire RG22 4DQ

    Change of use from Class B8 to Class B2 (General Industrial) use for units 17 and 18

    5 May 2026 Full applications
  • 26/01759/FUL Awaiting decision

    Park House Stables Winchester Road Kingsclere Hampshire RG20 5PY

    Removal of existing stable building and replacement with two new buildings serving as office, welfare facilities, client space and cricket pavilion. To include associated landscaping works and connection to the existing drainage system.

    24 Aug 2026 Full applications
  • 26/01751/FUL Awaiting decision

    Oakridge Methodist Church Vivian Road Basingstoke Hampshire RG21 5QB

    Siting of a temporary shipping container for storage purposes.

    21 Aug 2026 Full applications
  • 25/02621/FUL Granted

    Monts Farm Browninghill Browninghill Green Baughurst Hampshire RG26 5JZ

    Change of Land Use from Equestrian to Residential together with construction of one five bed detached dwelling house with detached carport and access driveway. Installation of air source heat pump.

    30 Oct 2025 Full applications
  • 26/01746/FUL Awaiting decision

    12 And 13 Bilton Industrial Estate Bilton Road Basingstoke Hampshire RG24 8NJ

    Conversion of units 12 and 13 to form 1 unit, together with refurbishment works including roof replacement; installation of new and redecoration of existing cladding; replacement of windows and doors; installation of photovoltaic (PV) panels and electric vehicle (EV) charging points; replacement of external air-conditioning units; and the removal of existing tenant installations.

    20 Aug 2026 Full applications