Planning application
12 Heather Drive Tadley Hampshire RG26 4QP
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.
Proposal
Change of use of open space to residential garden land and extension of rear left boundary fence.
As published by the council, reference 24/01728/FUL
Application record
- Reference
- 24/01728/FUL
- Type
- Full Planning Application
- Status
- Decided
- Decision
- Application Withdrawn
- Received
- 26 Jul 2024
- Validated
- 23 Sep 2024
- Decided
- 10 Dec 2024
- Ward
- Tadley North, Kingsclere & Baughurst
- Parish
- TADLEY CP
- Decision by
- Delegated
- Postcode
- RG26 4QP
Timeline
Dates from the published record
-
26 Jul 2024
Received by Basingstoke and Deane
-
23 Sep 2024
Validated
Checked as complete and ready for consideration.
-
10 Dec 2024
Decision issued: Application Withdrawn
-
22 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat withdrawal means
The applicant withdrew this application before Basingstoke and Deane decided it, and is free to submit a revised scheme at any time. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
10 Heather Drive Tadley Hampshire RG26 4QP
Erection of a front porch and single storey side extension following demolition of existing side extension.
Granted Householder Extension Demolition 9 docsSmall domestic -
Fir Tree Lodge Heather Drive Tadley Hampshire RG26 4QR
1 Oak: Crown reduce by 1/2m. 1 dead Beech: fell. 1 dead tree: fell.
Granted Trees 5 docs -
7 Birch Road Tadley Hampshire RG26 4QT
Erection of a single storey rear extension and change of external materials to brick.
Granted Householder Extension 8 docsSmall domestic -
11 Burnham Road Tadley Hampshire RG26 4QN
Erection of two storey side extension
Granted Householder Extension 9 docsDomestic -
48 Birch Road Tadley Hampshire RG26 4QS
Certificate of Lawfulness for the proposed single storey side extension to replace existing lean-to
Granted Lawful development Extension 14 docsSmall domestic -
40 Burnham Road Tadley Hampshire RG26 4QW
Certificate of Lawfulness for the proposed development of a single storey rear extension.
Granted Lawful development Extension 7 docsSmall domestic
Other full applications
In Basingstoke and Deane
-
26/00918/FUL Granted
Units 17 And 18 Lister Road Industrial Estate Sherrington Way Basingstoke Hampshire RG22 4DQ
Change of use from Class B8 to Class B2 (General Industrial) use for units 17 and 18
-
26/01759/FUL Awaiting decision
Park House Stables Winchester Road Kingsclere Hampshire RG20 5PY
Removal of existing stable building and replacement with two new buildings serving as office, welfare facilities, client space and cricket pavilion. To include associated landscaping works and connection to the existing drainage system.
-
26/01751/FUL Awaiting decision
Oakridge Methodist Church Vivian Road Basingstoke Hampshire RG21 5QB
Siting of a temporary shipping container for storage purposes.
-
25/02621/FUL Granted
Monts Farm Browninghill Browninghill Green Baughurst Hampshire RG26 5JZ
Change of Land Use from Equestrian to Residential together with construction of one five bed detached dwelling house with detached carport and access driveway. Installation of air source heat pump.
-
26/01746/FUL Awaiting decision
12 And 13 Bilton Industrial Estate Bilton Road Basingstoke Hampshire RG24 8NJ
Conversion of units 12 and 13 to form 1 unit, together with refurbishment works including roof replacement; installation of new and redecoration of existing cladding; replacement of windows and doors; installation of photovoltaic (PV) panels and electric vehicle (EV) charging points; replacement of external air-conditioning units; and the removal of existing tenant installations.