Planning application
Pykes House Mount Road Highclere Hampshire RG20 9QY
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Internal alterations to annexe to provide ancillary accommodation for parents
As published by the council, reference 24/00589/FUL
Application record
- Reference
- 24/00589/FUL
- Type
- Full Planning Application
- Status
- Decided
- Decision
- Granted
- Received
- 14 Mar 2024
- Validated
- 3 Apr 2024
- Decided
- 23 Oct 2024
- Ward
- Evingar
- Parish
- HIGHCLERE CP
- Decision by
- Delegated
- Postcode
- RG20 9QY
Timeline
Dates from the published record
-
14 Mar 2024
Received by Basingstoke and Deane
-
3 Apr 2024
Validated
Checked as complete and ready for consideration.
-
23 Oct 2024
Decision issued: Granted
-
2 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Basingstoke and Deane granted permission on 23 October 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Bears Cottage Tubbs Lane Highclere Newbury Hampshire RG20 9RB
Erection of a shed
Granted Householder 12 docsSmall domestic -
Pirates Cottage Tubbs Lane Highclere Hampshire RG20 9RB
Tree 1 Yew tree: prune. Tree 2 Yew tree: prune.
Withdrawn Trees 20 docs -
Pitt House Mount Road Highclere Newbury Hampshire RG20 9QY
Variation / removal of condition 1,3,4,7,14,15,19 and 22 of permission 21/01283/FUL for erection of detached dwelling and car port with a new vehicular access and associated works.
Granted Amendments New dwelling 20 docsDomestic -
Clere Wood House Church Lane Highclere Hampshire RG20 9RE
Proposed single storey side extension to replace existing conservatory.
Granted Householder Extension 10 docsSmall domestic -
Ferne Church Lane Highclere Hampshire RG20 9RE
Erection of a single storey extension on the rear elevation and garden room on the side elevation.
Granted Householder Extension 13 docsSmall domestic -
Ferne Church Lane Highclere Hampshire RG20 9RE
98% historically approved · decision due ~5 Oct
Single Storey rear extension and decking area
Awaiting decision Householder Extension 9 docsSmall domestic
Other full applications
In Basingstoke and Deane
-
26/00918/FUL Granted
Units 17 And 18 Lister Road Industrial Estate Sherrington Way Basingstoke Hampshire RG22 4DQ
Change of use from Class B8 to Class B2 (General Industrial) use for units 17 and 18
-
26/01759/FUL Awaiting decision
Park House Stables Winchester Road Kingsclere Hampshire RG20 5PY
Removal of existing stable building and replacement with two new buildings serving as office, welfare facilities, client space and cricket pavilion. To include associated landscaping works and connection to the existing drainage system.
-
26/01751/FUL Awaiting decision
Oakridge Methodist Church Vivian Road Basingstoke Hampshire RG21 5QB
Siting of a temporary shipping container for storage purposes.
-
25/02621/FUL Granted
Monts Farm Browninghill Browninghill Green Baughurst Hampshire RG26 5JZ
Change of Land Use from Equestrian to Residential together with construction of one five bed detached dwelling house with detached carport and access driveway. Installation of air source heat pump.
-
26/01746/FUL Awaiting decision
12 And 13 Bilton Industrial Estate Bilton Road Basingstoke Hampshire RG24 8NJ
Conversion of units 12 and 13 to form 1 unit, together with refurbishment works including roof replacement; installation of new and redecoration of existing cladding; replacement of windows and doors; installation of photovoltaic (PV) panels and electric vehicle (EV) charging points; replacement of external air-conditioning units; and the removal of existing tenant installations.