Skip to content
PlanIndex Get alerts
Menu

Planning application

6 And 8 Bay Tree Way Basingstoke Hampshire RG21 5QG

Granted Basingstoke and Deane 23/00381/FUL Full Planning Application

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

This application is for the replacement of the existing timber windows and external doors, with new PVCu double-glazed, rosewood casement windows and doors for nos 6 and 8

As published by the council, reference 23/00381/FUL

Application record

Reference
23/00381/FUL
Type
Full Planning Application
Status
Decided
Decision
Granted
Received
14 Feb 2023
Validated
14 Feb 2023
Decided
6 Apr 2023
Ward
Norden
Decision by
Delegated
Postcode
RG21 5QG

Timeline

Dates from the published record

  1. 14 Feb 2023

    Received by Basingstoke and Deane

  2. 6 Apr 2023

    Decision issued: Granted

  3. 16 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a surveying firm registered in London

68 applications on PlanIndex · across 14 councils · 80% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Basingstoke and Deane

  • 26/00918/FUL Granted

    Units 17 And 18 Lister Road Industrial Estate Sherrington Way Basingstoke Hampshire RG22 4DQ

    Change of use from Class B8 to Class B2 (General Industrial) use for units 17 and 18

    5 May 2026 Full applications
  • 26/01759/FUL Awaiting decision

    Park House Stables Winchester Road Kingsclere Hampshire RG20 5PY

    Removal of existing stable building and replacement with two new buildings serving as office, welfare facilities, client space and cricket pavilion. To include associated landscaping works and connection to the existing drainage system.

    24 Aug 2026 Full applications
  • 26/01751/FUL Awaiting decision

    Oakridge Methodist Church Vivian Road Basingstoke Hampshire RG21 5QB

    Siting of a temporary shipping container for storage purposes.

    21 Aug 2026 Full applications
  • 25/02621/FUL Granted

    Monts Farm Browninghill Browninghill Green Baughurst Hampshire RG26 5JZ

    Change of Land Use from Equestrian to Residential together with construction of one five bed detached dwelling house with detached carport and access driveway. Installation of air source heat pump.

    30 Oct 2025 Full applications
  • 26/01746/FUL Awaiting decision

    12 And 13 Bilton Industrial Estate Bilton Road Basingstoke Hampshire RG24 8NJ

    Conversion of units 12 and 13 to form 1 unit, together with refurbishment works including roof replacement; installation of new and redecoration of existing cladding; replacement of windows and doors; installation of photovoltaic (PV) panels and electric vehicle (EV) charging points; replacement of external air-conditioning units; and the removal of existing tenant installations.

    20 Aug 2026 Full applications