Skip to content
PlanIndex Get alerts
Menu

Planning application

Land At Foots Farm Southend Road Great Burstead Billericay Essex

Decided Basildon 25/01466/OUT Outline

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

Outline Planning Application (with all matters reserved except for points of access) for the residential led development, delivering up to 910 homes, along with a range of compatible supporting non-residential uses (Use Class E), provision of Gypsy and Traveller Pitches and public open space, associated amenity and infrastructure, whilst also providing land for educational uses (Use Class F1).

As published by the council, reference 25/01466/OUT

Application record

Reference
25/01466/OUT
Category
Outline
Status
Unknown
Decision
Non Determination
Received
4 Nov 2025
Validated
5 Nov 2025
Decided
1 Oct 2026
Ward
Burstead
Parish
Great Burstead And South Green Parish

Timeline

Dates from the published record

  1. 4 Nov 2025

    Received by Basildon

  2. 5 Nov 2025

    Validated

    Checked as complete and ready for consideration.

  3. 23 Jul 2026

    Added to PlanIndex

  4. 1 Oct 2026

    Decision issued: Non Determination

  5. 1 Oct 2026

    Status changed to Unknown

    Previously Awaiting decision.

Cases linked to this one on the register

  • Appeal: 26/00050/NONDET (Appeal Lodged)

Documents

Plans, drawings, consultee responses and the officer's report

67 documents on file for this application

  • HEALTH IMPACT ASSESSMENT BackGround Papers - Redacted · 27 Aug 2026
  • HEALTH IMPACT ASSESSMENT - APPENDIX 1 BackGround Papers - Redacted · 27 Aug 2026
  • TIER 2 PRE-PLANNING ASSESSMENT REPORT BackGround Papers - Redacted · 14 Aug 2026
  • MINERALS RESOURCE ASSESSMENT - UPDATE BackGround Papers - Redacted · 14 Aug 2026
  • ROUTE OVERVIEW PLAN Drawing · 14 Aug 2026
  • PROPOSED COXES FARM ROAD ACCESS Drawing · 14 Aug 2026
  • ENVIRONMENTAL STATEMENT VOLUME 1 FINAL 1 BackGround Papers - Redacted · 21 Jul 2026
  • ES NON TECHNICAL SUMMARY FINAL 1 BackGround Papers - Redacted · 21 Jul 2026
  • BNG STAT METRIC BNG · 07 Jul 2026
  • LAND EAST OF SOUTHEND ROAD PLANNING STATEMENT BackGround Papers - Redacted · 07 Jul 2026
  • ACCESS AND MOVEMENT PARAMETER PLAN Drawing · 07 Jul 2026
  • A129 SOUTHEND ROAD 4A-D AND AUDIT PHOTOS BackGround Papers - Redacted · 07 Jul 2026
  • BASE MODEL NETWORK EXTENT, LINK LOCATIONS AND APPENDICES BackGround Papers - Redacted · 07 Jul 2026
  • ENVIRONMENTAL STATEMENT TECHNICAL APPENDICES VOLUME 3 BackGround Papers - Redacted · 07 Jul 2026
  • ENVIRONMENTAL STATEMENT VOLUME 2 BackGround Papers - Redacted · 07 Jul 2026
  • ES AIR QUALITY ASSESSMENT AND APPENDICES BackGround Papers - Redacted · 07 Jul 2026
  • ES DRAWINGS AND APPENDICES Drawing · 07 Jul 2026
  • ES OBSIDIAN STRATEGIC AND APPENDICES BackGround Papers - Redacted · 07 Jul 2026
  • ES TECHNICAL APPENDICES - VOLUME 3 BackGround Papers - Redacted · 07 Jul 2026
  • LANDSCAPE PLAN Drawing · 07 Jul 2026
  • LOCAL MODEL VALIDATION REPORT AND APPENDICES BackGround Papers - Redacted · 07 Jul 2026
  • LOCATION PLAN AND PHOTOS Drawing · 07 Jul 2026
  • PART 2 ENVIRONMENTAL STATEMENT VOLUME 1 BackGround Papers - Redacted · 07 Jul 2026
  • PHOTOS, CONCEPT PLANS AND APPENDICES BackGround Papers - Redacted · 07 Jul 2026
  • SITE LOCATION, HERITAGE DESIGNATIONS AND ARCHAEOLOGICAL FINDSPOTS Drawing · 07 Jul 2026
  • TABLE C1 LANDSCAPE EFFECTS BackGround Papers - Redacted · 07 Jul 2026
  • TABLE C2A VISUAL EFFECTS BackGround Papers - Redacted · 07 Jul 2026
  • AGRICULTURAL LAND CLASSIFICATION AND SOIL RESOURCES REPORT BackGround Papers - Redacted · 07 Jul 2026
  • ARBORICULTURAL IMPACT ASSESSMENT BackGround Papers - Redacted · 07 Jul 2026
  • ARCHAEOLOGICAL DESK-BASED ASSESSMENT BackGround Papers - Redacted · 07 Jul 2026
  • BIODIVERSITY NET GAIN ASSESSMENT BackGround Papers - Redacted · 07 Jul 2026
  • BUILDING HEIGHT PARAMETER PLAN Drawing · 07 Jul 2026
  • COMMERCIAL NEEDS ASSESSMENT BackGround Papers - Redacted · 07 Jul 2026
  • DESIGN & ACCESS STATEMENT BackGround Papers - Redacted · 07 Jul 2026
  • DESIGN CODE BackGround Papers - Redacted · 07 Jul 2026
  • ECOLOGICAL MANAGEMENT PLAN BackGround Papers - Redacted · 07 Jul 2026
  • ENERGY & SUSTAINABILITY BackGround Papers - Redacted · 07 Jul 2026
  • FLOOD RISK ASSESSMENT PART 1 BackGround Papers - Redacted · 07 Jul 2026
  • FLOOD RISK ASSESSMENT PART 2 BackGround Papers - Redacted · 07 Jul 2026
  • FLOOD RISK ASSESSMENT PART 3 BackGround Papers - Redacted · 07 Jul 2026
  • FLOOD RISK ASSESSMENT PART 4 BackGround Papers - Redacted · 07 Jul 2026
  • FLOOD RISK ASSESSMENT PART 5 BackGround Papers - Redacted · 07 Jul 2026
  • FLOOD RISK ASSESSMENT PART 6 BackGround Papers - Redacted · 07 Jul 2026
  • FRAMEWORK PLAN Drawing · 07 Jul 2026
  • GEOPHYSICAL REPORT PART 1 BackGround Papers - Redacted · 07 Jul 2026
  • GEOPHYSICAL REPORT PART 2 BackGround Papers - Redacted · 07 Jul 2026
  • GREEN BELT ASSESSMENT BackGround Papers - Redacted · 07 Jul 2026
  • HERITAGE STATEMENT P1 BackGround Papers - Redacted · 07 Jul 2026
  • HERITAGE STATEMENT P2 BackGround Papers - Redacted · 07 Jul 2026
  • HERITAGE STATEMENT P3 BackGround Papers - Redacted · 07 Jul 2026
  • LAND USE PARAMETER PLAN Drawing · 07 Jul 2026
  • LANDSCAPE AND OPEN SPACE PARAMETER PLAN Drawing · 07 Jul 2026
  • LANDSCAPE STRATEGY PLAN Drawing · 07 Jul 2026
  • LIGHTING ASSESSMENT BackGround Papers - Redacted · 07 Jul 2026
  • MINERAL RESOURCE ASSESSMENT BackGround Papers - Redacted · 07 Jul 2026
  • OBSIDIAN STATEMENT OF COMMUNITY INVOLVEMENT BackGround Papers - Redacted · 07 Jul 2026
  • OUTLINE EMPLOYMENT SKILLS AND PLAN BackGround Papers - Redacted · 07 Jul 2026
  • PHASE 1 PART1 BackGround Papers - Redacted · 07 Jul 2026
  • PHASE 1 PART 2 BackGround Papers - Redacted · 07 Jul 2026
  • PHASE 1 PART 3 BackGround Papers - Redacted · 07 Jul 2026
  • PHASE 1 PART 4 BackGround Papers - Redacted · 07 Jul 2026
  • PHASE 1 PART 5 BackGround Papers - Redacted · 07 Jul 2026
  • PHASE 1 PART 6 BackGround Papers - Redacted · 07 Jul 2026
  • SANG INSET BackGround Papers - Redacted · 07 Jul 2026
  • SITE WASTE MANAGEMENT PLAN BackGround Papers - Redacted · 07 Jul 2026
  • UTILITIES BackGround Papers - Redacted · 07 Jul 2026
  • APPLICATION FOR OUTLINE PLANNING PERMISSION_REDACTED. Application Form · 06 Jul 2026

Watch members (£5 a month) open the document list from here.

Open the documents

After the decision

Basildon has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

In Basildon

  • 26/00794/OUT Granted

    Dunton Grange Lower Dunton Road Dunton Basildon Essex CM13 3SN

    Outline application for the demolition of existing stable building and the construction of 7 no. new dwellings, access improvements from Lower Dunton Road and associated development

    Received 13 Jul, published by the council 23 Jul 2026 Outline
  • 24/01047/OUT Awaiting decision

    Blackthorn Stud Kennel Lane Billericay Essex CM12 9RS

    Outline application with all matters reserved (except access) for the construction of up to 11 dwellings.

    Received 6 Sep, published by the council 1 Oct 2026 Outline
  • 25/00794/OUT Granted

    Great Broomfields Cranfield Park Road Wickford Essex SS12 9EP

    Outline application with all matters reserved (except access) for the demolition and partial demolition of the existing commercial buildings, construction of 26 no. retirement apartments (Use Class C2), and a 70 no. bed care home (Use Class C2); alterations and change of use of the remaining commercial building to a residents tea/day room.

    Received 5 Jun, published by the council 24 Sep 2026 Outline
  • 25/00575/OUT Refused

    Magdalen Lodge Potash Road Billericay Essex CM11 1HG

    Outline planning application for up to 49No. residential dwellings (including affordable housing), with all matters reserved except for access. Creation of a new access from Potash Road

    Received 30 Apr, published by the council 23 Jul 2026 Outline
  • 26/00982/SCREEN Awaiting decision

    Land North Of Nevendon Road Basildon Essex

    EIA Screening Opinion - Proposal for up to 380 residential dwellings, including the potential provision of a healthcare facility, provision of new surface water drainage basins, vehicular and pedestrian access arrangements, public open space, landscaping, pedestrian and cycle links, enhancements to existing Public Rights of Way, and associated infrastructure works; all matters reserved except access.

    Received 3 Sep, published by the council 7 Sep 2026 Outline