Skip to content
PlanIndex Get alerts
Menu

Planning application

153 School Avenue Laindon Basildon Essex SS15 6LZ

Granted Basildon 24/00912/LDCP LDC - Proposed

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

To establish the lawfulness of a proposed rear extension

As published by the council, reference 24/00912/LDCP

Application record

Reference
24/00912/LDCP
Type
LDC - Proposed
Status
Decided
Decision
Granted
Received
5 Aug 2024
Validated
6 Aug 2024
Decided
30 Sep 2024
Ward
Laindon Park
Decision by
Chief Planner Decisions
Postcode
SS15 6LZ

Timeline

Dates from the published record

  1. 5 Aug 2024

    Received by Basildon

  2. 6 Aug 2024

    Validated

    Checked as complete and ready for consideration.

  3. 30 Sep 2024

    Decision issued: Granted

  4. 19 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

  • DECISION NOTICE Decision · 30 Sep 2024
  • APPLICATION FORM - WITHOUT PERSONAL DATA Application Form · 05 Aug 2024
  • LOCATION PLAN Drawing · 05 Aug 2024
  • BLOCK PLAN Drawing · 05 Aug 2024
  • EXISTING AND PROPOSED PLANS Drawing · 05 Aug 2024

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Basildon granted permission on 30 September 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Basildon

  • 24/01047/OUT Awaiting decision

    Blackthorn Stud Kennel Lane Billericay Essex CM12 9RS

    Outline application with all matters reserved (except access) for the construction of up to 11 dwellings.

    Received 6 Sep, published by the council 1 Oct 2026 Outline
  • 25/00794/OUT Granted

    Great Broomfields Cranfield Park Road Wickford Essex SS12 9EP

    Outline application with all matters reserved (except access) for the demolition and partial demolition of the existing commercial buildings, construction of 26 no. retirement apartments (Use Class C2), and a 70 no. bed care home (Use Class C2); alterations and change of use of the remaining commercial building to a residents tea/day room.

    Received 5 Jun, published by the council 24 Sep 2026 Outline
  • 26/01019/SCOPE Awaiting decision

    Land North Of London Road Pitsea Essex

    EIA Screening Opinion - Outline planning application for a phased residential-led, masterplan scale development to provide up to 800 dwellings (Use Class C3) and approximately up to 1,900m2 (Gross Internal Area (GIA)) of flexible commercial and/or community space (Use Classes E and/or F2), together with associated access routes, car parking facilities, landscaping, open spaces, drainage systems and other associated works (the Proposed Development).

    Received 21 Sep, published by the council 28 Sep 2026 Outline
  • 25/00575/OUT Refused

    Magdalen Lodge Potash Road Billericay Essex CM11 1HG

    Outline planning application for up to 49No. residential dwellings (including affordable housing), with all matters reserved except for access. Creation of a new access from Potash Road

    Received 30 Apr, published by the council 23 Jul 2026 Outline
  • 26/00977/CC Awaiting decision

    Veolia Pitsea Hall Lane Pitsea Essex SS16 4UH

    ESS/57/24/BAS/13/01 - Details pursuant to condition 13 (Biodiversity Enhancement Strategy) off ESS/57/24/BAS. ESS/57/24/BAS was for "The retention of the open windrow green waste composting facility and shredding of oversized green waste and lateral extension of the site to facilitate the introduction of waste wood shredding operations and the retention of existing associated buildings and infrastructure"

    Received 3 Sep, published by the council 7 Sep 2026 Outline