Planning application
200 London Road Wickford Essex SS12 0ET
Works: Demolition
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Outline planning application with all matters reserved except means of access, for the demolition of all existing buildings, structures and hardstanding and erection of up to 49 residential dwellings (Use Class C3), with open space and associated infrastructure including main vehicular access point from London Road (A129), at 200 London Road, and land to the rear, Wickford.
As published by the council, reference 23/00881/OUT
Application record
- Reference
- 23/00881/OUT
- Type
- Outline Application
- Status
- Decided
- Decision
- Granted
- Received
- 1 Jul 2023
- Validated
- 6 Jul 2023
- Decided
- 17 Oct 2024
- Ward
- Crouch
- Parish
- Wickford Town Council
- Decision by
- Committee Decision
- Postcode
- SS12 0ET
Timeline
Dates from the published record
-
1 Jul 2023
Received by Basildon
-
6 Jul 2023
Validated
Checked as complete and ready for consideration.
-
17 Oct 2024
Decision issued: Granted
-
19 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
1 later application on the register refers to this one:
-
26/00789/REM Awaiting decision
Lyndhurst 200 London Road Wickford Essex SS12 0ET
Reserved Matters following the Granting of outline planning permission 23/00881/OUT for the creation of 49 new homes plus associated open space and infrastructure.
Who's behind it
Company information only, from the register and Companies House
DPV Consult Agent, registered in Marlow
Active · incorporated 2020 · Marlow
18 applications on PlanIndex · across 9 councils · 50% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
68 documents on file for this application
- REVISED - ILLUSTRATIVE MASTERPLAN
- REVISED - ILLUSTRATIVE GREEN INFRASTRUCTURE
- REVISED - ILLUSTRATIVE LAND USE
- CONTAMINATION REPORT
- CONTAMINATION REPORT APPENDICES
- CONTAMINATION REPORT APPENDICES
- CONTAMINATION REPORT APPENDICES
- CONTAMINATION REPORT APPENDICES
- ARBORICULTURAL IMPACT ASSESSMENT
- ARBORICULTURAL IMPACT ASSESSMENT - TPP
- HEALTH IMPACT ASSESSMENT
- BAT SURVEY REPORT
- SUSTAINABILITY AND ENERGY REPORT
- AIR QUALITY ASSESSMENT
- REPTILE SURVEY REPORT
- LANDSCAPE AND VISUAL APPRAISAL
- LANDSCAPE AND VISUAL APPRAISAL - APPENDICES
- LANDSCAPE AND VISUAL APPRAISAL - APPENDICES
- LANDSCAPE AND VISUAL APPRAISAL - APPENDICES
- LANDSCAPE AND VISUAL APPRAISAL - APPENDICES
- NOISE IMPACT ASSESSMENT
- CONTOURING LEVELS
- EXISTING USE AND DEVELOPMENT PLAN
- CONSULTATIONS STATEMENT
- VISUALISATION
- AERIAL STUDIES
- PLANNING STATEMENT
- APPENDICES TO HEALTH IMPACT ASSESSMENT
- NON-TECHNICAL EXPLANATORY MEMO ON UTILITY MATTERS FOR NEW HOMES
- REPTILE SURVEY REPORT
- RESPONSE TO ECOLOGY CONSULTATION
- FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY
- FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY
- FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY
- FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY
- FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY
- FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY
- DESIGN & ACCESS STATEMENT - PART 1
- DESIGN & ACCESS STATEMENT - PART 2
- DESIGN & ACCESS STATEMENT - PART 3
- DESIGN & ACCESS STATEMENT - PART 4
- DESIGN & ACCESS STATEMENT - PART 5
- DESIGN & ACCESS STATEMENT - PART 6
- LOCATION PLAN
- SUPERSEDED - GREEN INFRASTRUCTURE PARAMETER PLAN
- ACCESS AND MOVEMENT PARAMETER PLAN
- BUILDING HEIGHTS PARAMETER PLAN
- SUPERSEDED - ILLUSTRATIVE MASTERPLAN
- NON-TECHNICAL EXPLANATORY MEMORANDUM ON HIGHWAY AND TRANSPORTATION MATTERS FOR N
- INDICATIVE SURFACE WATER DRAINAGE STRATEGY PLAN
- APPLICATION FORM - WITHOUT PERSONAL DATA
- TOPOGRAPHIC SURVEY
- EXISTING AND PROPOSED AERIAL STUDY
- GREEN BELT APPRAISAL
- LANDSCAPE AND VISUAL APPRAISAL - PART 2
- LANDSCAPE AND VISUAL APPRAISAL - PART 3
- LANDSCAPE AND VISUAL APPRAISAL - PART 1
- PRELIMINARY ECOLOGICAL APPRAISAL REPORT
- HERITAGE DESK BASED ASSESSMENT
- FRAMEWORK TRAVEL PLAN
- UTILITIES STATEMENT - PART 1
- UTILITIES STATEMENT - PART 2
- BUILDING HEIGHTS PARAMETER PLAN
- EXISTING USE AND DEVELOPMENT PLAN
- TRANSPORT ASSESSMENT - PART 1
- TRANSPORT ASSESSMENT - PART 2
- TRANSPORT ASSESSMENT - PART 3
- STAGE 1 ROAD SAFETY AUDIT
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Basildon granted permission on 17 October 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Lyndhurst 200 London Road Wickford Essex SS12 0ET
91% historically approved · decision due ~7 Sep
Reserved Matters following the Granting of outline planning permission 23/00881/OUT for the creation of 49 new homes plus associated open space and infrastructure.
Awaiting decision Reserved matters 24 docs -
Squirrels Nest Sugden Avenue Wickford Essex SS12 0JB
Conversion of existing detached garage into annexe with new front porch and external alterations
Refused Full applications Extension 6 docsSmall domestic -
Thornfield Sugden Avenue Wickford Essex SS12 0JB
To establish the lawfulness of the existing two storey dwellinghouse with conservatory, detached garage and detached summerhouse
Granted Extension 6 docsSmall domestic -
Thornfield Sugden Avenue Wickford Essex SS12 0JB
To establish the lawfulness of a proposed rear flat roof dormer, front roof lights and removal of conservatory.
Granted Extension Loft or dormer 5 docs -
The Poppies Sugden Avenue Wickford Essex SS12 0JB
To establish the lawfulness of the proposed siting of a mobile home/hybrid garden annexe, within the curtilage of an existing dwelling.
Granted 10 docsDomestic -
178 London Road Wickford Essex SS12 0ET
Proposed outbuilding to rear garden
Granted Full applications 4 docs
Other outline applications
In Basildon
-
24/01047/OUT Awaiting decision
Blackthorn Stud Kennel Lane Billericay Essex CM12 9RS
Outline application with all matters reserved (except access) for the construction of up to 11 dwellings.
-
25/00794/OUT Granted
Great Broomfields Cranfield Park Road Wickford Essex SS12 9EP
Outline application with all matters reserved (except access) for the demolition and partial demolition of the existing commercial buildings, construction of 26 no. retirement apartments (Use Class C2), and a 70 no. bed care home (Use Class C2); alterations and change of use of the remaining commercial building to a residents tea/day room.
-
26/01019/SCOPE Awaiting decision
Land North Of London Road Pitsea Essex
EIA Screening Opinion - Outline planning application for a phased residential-led, masterplan scale development to provide up to 800 dwellings (Use Class C3) and approximately up to 1,900m2 (Gross Internal Area (GIA)) of flexible commercial and/or community space (Use Classes E and/or F2), together with associated access routes, car parking facilities, landscaping, open spaces, drainage systems and other associated works (the Proposed Development).
-
25/00575/OUT Refused
Magdalen Lodge Potash Road Billericay Essex CM11 1HG
Outline planning application for up to 49No. residential dwellings (including affordable housing), with all matters reserved except for access. Creation of a new access from Potash Road
-
26/00977/CC Awaiting decision
Veolia Pitsea Hall Lane Pitsea Essex SS16 4UH
ESS/57/24/BAS/13/01 - Details pursuant to condition 13 (Biodiversity Enhancement Strategy) off ESS/57/24/BAS. ESS/57/24/BAS was for "The retention of the open windrow green waste composting facility and shredding of oversized green waste and lateral extension of the site to facilitate the introduction of waste wood shredding operations and the retention of existing associated buildings and infrastructure"