Skip to content
PlanIndex Get alerts
Menu

Planning application

26 Norfolk Close Laindon Basildon Essex SS15 6QR

Granted Basildon 21/00873/FULL Full Application

Works: Extension Demolition Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of existing shed and erection of a single-storey side extension

As published by the council, reference 21/00873/FULL

Application record

Reference
21/00873/FULL
Type
Full Application
Status
Decided
Decision
Granted
Received
27 May 2021
Validated
27 May 2021
Decided
2 Sep 2021
Ward
Laindon Park
Decision by
Members' List
Postcode
SS15 6QR

Timeline

Dates from the published record

  1. 27 May 2021

    Received by Basildon

  2. 2 Sep 2021

    Decision issued: Granted

  3. 1 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Basildon

  • 26/00970/FULL Awaiting decision

    12 Wick Beech Avenue Wickford Essex SS11 8AP

    Erection of single-storey rear extension, and a part first-floor front extension over the existing garage with a roof pitch and external fenestration.

    3 Sep 2026 Full applications
  • 26/00968/FULL Awaiting decision

    31 Curlew Crescent Basildon Essex SS16 5HR

    Erection of a rear single-storey extension and a front porch.

    3 Sep 2026 Full applications
  • 26/00966/FULL Awaiting decision

    The Lillies Gardiners Lane North Billericay Essex CM11 2XA

    The construction of 4 new dwellings following removal of a caravan and other existing structures.

    2 Sep 2026 Full applications
  • 26/00967/FULL Awaiting decision

    91 Worthing Road Laindon Essex SS15 6JU

    Single-storey rear extension replacing the existing conservatory. First-floor rear extension with a pitched roof and small valley gutter. A single-storey side extension and porch extension.

    2 Sep 2026 Full applications
  • 26/00963/FULL Awaiting decision

    24 Hunts Mead Billericay Essex CM12 9JA

    Ground floor rear extension

    1 Sep 2026 Full applications