Skip to content
PlanIndex Get alerts
Menu

Planning application

Essex Retail Packers Unit 9 Harvey Road Basildon Essex SS13 1QJ

Granted Basildon 20/00802/FULL Full Application

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed extension & refurbishment of existing commercial premises for B1 (office) and B8 (warehouse) uses

As published by the council, reference 20/00802/FULL

Application record

Reference
20/00802/FULL
Type
Full Application
Status
Decided
Decision
Granted
Received
8 Jul 2020
Validated
10 Jul 2020
Decided
21 Oct 2020
Ward
Pitsea North West
Decision by
Committee Decision
Postcode
SS13 1QJ

Timeline

Dates from the published record

  1. 8 Jul 2020

    Received by Basildon

  2. 10 Jul 2020

    Validated

    Checked as complete and ready for consideration.

  3. 21 Oct 2020

    Decision issued: Granted

  4. 1 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Eastlon House Harvey Road Burnts Mills Industrial Estate Basildon Essex SS13 1DF

    25/01649/FULL Submitted 18 Dec 2025 86m away

    78% historically approved · decision due ~13 Feb

    Demolish 2no. existing warehouse buildings and associated structures and erect a new storage and distribution warehouse building including associated office space, loading bays, and canopy, including new surfacing, and new layout parking.

    Awaiting decision Full applications Demolition
  • 11 Great Leighs Way Pitsea Basildon Essex SS13 1QN

    20/00743/TPOBAS Submitted 26 Jun 2020 93m away

    Crown reduce lateral branches by 3-4 metres off the rear, facing No.11, crown reduce roadside lateral branches by up to 2 metres; and crown reduce height by approximately 1 metres of oak tree located to the rear of 11 Great Leighs Way, fronting Burnt Mills Road (T1 of TPO/14/94)

    Granted Trees 2 docs
  • 12 Great Leighs Way Pitsea Basildon Essex SS13 1QN

    20/00709/FULL Submitted 20 Jun 2020 157m away

    Part single, part first floor, part two-storey side extension & single storey rear extension

    Granted Full applications Extension 4 docs
    Small domestic
  • 12 Tenterfields Pitsea Basildon Essex SS13 1BB

    24/01225/NMABAS Submitted 21 Oct 2024 191m away

    To establish whether changes to the external finish (brickwork to white render) and a change from a lantern roof light to 3no. roof lights can be considered as non-material amendments to granted consent 24/00540/FULL.

    Granted Amendments Loft or dormer 3 docs
  • Gilbert Barker House Burnt Mills Road Pitsea Essex SS13 1DT

    21/00942/FULL Submitted 11 Jun 2021 194m away

    Installation of mezzanine floor to be used as offices, insertion of windows on the western elevation, removal of the roller shutter door and replacement of facade.

    Granted Full applications Windows or glazing 15 docs
  • 11 Hawbush Green Pitsea Basildon Essex SS13 1QL

    21/00447/LDCP Submitted 18 Mar 2021 205m away

    To establish the lawfulness of a proposed single-storey rear extension

    Granted Outline Extension 6 docs
    Small domestic

In Basildon

  • 26/00980/FULL Awaiting decision

    Pipps Hill Farm Pipps Hill Road North Billericay Essex CM11 2UJ

    Two storey front and rear and side extensions and alterations to roof including front and rear dormers.

    7 Sep 2026 Full applications
  • 26/00983/FULL Awaiting decision

    10 Woodlands Road Wickford Essex SS12 0AL

    Demolition of vacant office building and construction of a one x1 bedroom single storey dwelling.

    7 Sep 2026 Full applications
  • 26/00975/FULL Awaiting decision

    The Gatehouse Noak Hill Road Great Burstead Billericay Essex CM12 9UL

    Erection of single storey rear extension, new front dormer, new velux windows, sun tunnel and internal alternations.

    4 Sep 2026 Full applications
  • 26/00970/FULL Awaiting decision

    12 Wick Beech Avenue Wickford Essex SS11 8AP

    Erection of single-storey rear extension, and a part first-floor front extension over the existing garage with a roof pitch and external fenestration.

    3 Sep 2026 Full applications
  • 26/00968/FULL Awaiting decision

    31 Curlew Crescent Basildon Essex SS16 5HR

    Erection of a rear single-storey extension and a front porch.

    3 Sep 2026 Full applications