Planning application
Pitsea Landfill Site Pitsea Hall Lane Pitsea Essex
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Continuation of installation of waste pre-treatment facilities and recontouring of the landfill to facilitate restoration permitted by ESS/35/06/BAS without compliance with condition 4 (completion timescales), to allow waste to be deposited on site until 31 December 2025 and the site restored to nature conservation by 31 December 2027 and without compliance with condition 3 (waste geographical sources) to allow importation of waste from outside Essex and Southend and also without the development of the previously permitted waste pre-treatment facility - ESS/49/14/BAS
As published by the council, reference 20/00564/CC
Application record
- Reference
- 20/00564/CC
- Type
- Consultation with County Planning
- Status
- Awaiting decision
- Decision
- Granted As published: No Objection
- Received
- 22 May 2020
- Validated
- 22 May 2020
- Decided
- 19 Jun 2020
- Ward
- Pitsea South East
- Parish
- Bowers Gifford/Nth Ben Parish Council
- Decision by
- Chief Planner Decisions
Site history
Applications at this address on the Basildon register
This site has had 5 applications since 2020: 1 approved, 0 refused.
-
25/01396/CC Awaiting decision
Pitsea Landfill Site Pitsea Hall Lane Pitsea Essex
ESS/15/25/BAS/APP Continuation of recontouring of the landfill to facilitate restoration permitted by ESS/49/14/BAS without compliance with condition 4 (completion timescales), condition 5 (removal of buildings and equipment) and condition 21 (restoration scheme) to delay restoration of the composting (and proposed waste wood processing) area and access road and weighbridge facilities by 10 years. ESS/49/14/BAS was a variation permission of ESS/35/06/BAS for recontouring of the landfill to facilitate restoration.
-
23/00310/ESS Decided
Pitsea Landfill Site Pitsea Hall Lane Pitsea Essex
ESS/07/23/BAS/SO - Continuation of development permitted by ESS/60/17/BAS without compliance with condition 1 (Timescale's for cessation of use and completion of restoration) to allow retention of the composting facility. Planning permission ESS/60/17/BAS was a variation of an earlier permission the original permission being ESS/67/96/BAS which was for "Waste composting facility, including storage and reception buildings, composting tunnels, biofilter, air treatment room and office, laboratory."
-
23/00309/ESS Decided
Pitsea Landfill Site Pitsea Hall Lane Pitsea Essex
ESS/05/23/BAS/SO - Continuation of development permitted by ESS/62/17/BAS without compliance with condition 2 (timescales for cessation of use and completion of restoration). ESS/62/17/BAS was a variation of ESS/19/12/BAS which was for "Use of 1.3ha land within the existing site to store compost oversize product and to enable provision and operation of machinery for the further treatment and recycling of the oversize product"
-
23/00308/ESS Decided
Pitsea Landfill Site Pitsea Hall Lane Pitsea Essex
ESS/06/23/BAS/SO - Continuation of development permitted by ESS/59/17/BAS without compliance with condition 2 (development restriction) and condition 3 (timescales for cessation of use and completion of restoration). ESS/59/17/BAS was a variation of ESS/50/08/BAS which was for "Change of use of land to enable provision and operation of machinery for the pre-treatment of inert waste to create restoration soils"
Timeline
Dates from the published record
-
22 May 2020
Received by Basildon
-
19 Jun 2020
Decision issued: No Objection
-
1 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Basildon granted permission on 19 June 2020, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Pitsea Landfill Site Pitsea Hall Lane Pitsea Essex
ESS/07/23/BAS/SO - Continuation of development permitted by ESS/60/17/BAS without compliance with condition 1 (Timescale's for cessation of use and completion of restoration) to allow retention of the composting facility. Planning permission ESS/60/17/BAS was a variation of an earlier permission the original permission being ESS/67/96/BAS which was for "Waste composting facility, including storage and reception buildings, composting tunnels, biofilter, air treatment room and office, laboratory."
Decided Other 2 docs -
Pitsea Landfill Site Pitsea Hall Lane Pitsea Essex
ESS/05/23/BAS/SO - Continuation of development permitted by ESS/62/17/BAS without compliance with condition 2 (timescales for cessation of use and completion of restoration). ESS/62/17/BAS was a variation of ESS/19/12/BAS which was for "Use of 1.3ha land within the existing site to store compost oversize product and to enable provision and operation of machinery for the further treatment and recycling of the oversize product"
Decided Other 2 docs -
Pitsea Landfill Site Pitsea Hall Lane Pitsea Essex
ESS/06/23/BAS/SO - Continuation of development permitted by ESS/59/17/BAS without compliance with condition 2 (development restriction) and condition 3 (timescales for cessation of use and completion of restoration). ESS/59/17/BAS was a variation of ESS/50/08/BAS which was for "Change of use of land to enable provision and operation of machinery for the pre-treatment of inert waste to create restoration soils"
Decided Other 2 docs -
Veolia Pitsea Hall Lane Pitsea Essex SS16 4UH
ESS/57/24/BAS/SO - EIA Screening Opinion: Retention of the open windrow green waste composting facility and shredding of oversized green waste and lateral extension of the site to facilitate the introduction of waste wood shredding operations and the retention of existing associated buildings and infrastructure.
Decided Outline Extension 2 docs
Other outline applications
In Basildon
-
24/01047/OUT Awaiting decision
Blackthorn Stud Kennel Lane Billericay Essex CM12 9RS
Outline application with all matters reserved (except access) for the construction of up to 11 dwellings.
-
25/00794/OUT Granted
Great Broomfields Cranfield Park Road Wickford Essex SS12 9EP
Outline application with all matters reserved (except access) for the demolition and partial demolition of the existing commercial buildings, construction of 26 no. retirement apartments (Use Class C2), and a 70 no. bed care home (Use Class C2); alterations and change of use of the remaining commercial building to a residents tea/day room.
-
26/01019/SCOPE Awaiting decision
Land North Of London Road Pitsea Essex
EIA Screening Opinion - Outline planning application for a phased residential-led, masterplan scale development to provide up to 800 dwellings (Use Class C3) and approximately up to 1,900m2 (Gross Internal Area (GIA)) of flexible commercial and/or community space (Use Classes E and/or F2), together with associated access routes, car parking facilities, landscaping, open spaces, drainage systems and other associated works (the Proposed Development).
-
25/00575/OUT Refused
Magdalen Lodge Potash Road Billericay Essex CM11 1HG
Outline planning application for up to 49No. residential dwellings (including affordable housing), with all matters reserved except for access. Creation of a new access from Potash Road
-
26/00977/CC Awaiting decision
Veolia Pitsea Hall Lane Pitsea Essex SS16 4UH
ESS/57/24/BAS/13/01 - Details pursuant to condition 13 (Biodiversity Enhancement Strategy) off ESS/57/24/BAS. ESS/57/24/BAS was for "The retention of the open windrow green waste composting facility and shredding of oversized green waste and lateral extension of the site to facilitate the introduction of waste wood shredding operations and the retention of existing associated buildings and infrastructure"