Skip to content
PlanIndex Get alerts
Menu

Planning application

198 Milton Road, Hoyland, Barnsley, S74 9BW

Granted Barnsley 2024/0777 Householder

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed single storey front extension.

As published by the council, reference 2024/0777

Application record

Reference
2024/0777
Type
Householder
Status
Final Decision
Decision
Granted As published: Approve with Conditions
Received
2 Sep 2024
Decided
11 Nov 2024
Ward
Hoyland Milton Ward
Decision by
Delegated
Postcode
S74 9BW

Timeline

Dates from the published record

  1. 2 Sep 2024

    Received by Barnsley

  2. 11 Nov 2024

    Decision issued: Approve with Conditions

  3. 23 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Barnsley granted permission on 11 November 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About householder applications

Householder applications cover work to an existing house and its garden, such as extensions, lofts and outbuildings, and cannot create a separate dwelling or change what the building is used for. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Cobble Cottage, 204/208 Milton Road, Hoyland, Barnsley, S74 9BW

    2022/1180 Submitted 15 Nov 2022 50 yards away

    Crown lift Ash tree T1 to 4m, crown clean, remove bottom secondary branch which forks from the main primary limb that overhangs the road as shown within the blue circle on the photograph and prune branches overhanging the telephone lines as marked on the photograph within TPO 8/1995.

    Granted Trees 7 docs
  • 186 Milton Road, Hoyland, Barnsley, S74 9BW

    2020/0497 Submitted 18 May 2020 50 yards away

    Formation of parking area to front of dwelling, new vehicular access point and associated entrance gates and piers

    Granted Householder 5 docs
    Domestic
  • 186 Milton Road, Hoyland, Barnsley, S74 9BW

    2019/0360 Submitted 22 Mar 2019 50 yards away

    Erection of single storey extensions to front and side of dwelling

    Granted Householder Extension 3 docs
    Small domestic
  • 186 Milton Road, Hoyland, Barnsley, S74 9BW

    2016/1507 Submitted 2 Dec 2016 50 yards away

    Erection of detached garage.

    Refused Householder 5 docs
    Domestic
  • 157 Clough Fields Road, Hoyland, Barnsley, S74 0ES

    2021/0833 Submitted 14 Jun 2021 100 yards away

    Formation of driveway and associated dropped kerb

    Granted Full applications 6 docs
  • Lynton, Broad Carr Road, Hoyland, Barnsley, S74 9BT

    2024/0760 Submitted 29 Aug 2024 150 yards away

    Erection of single storey side extension and rendering of all elevations of dwelling at ground floor level. (Amendment to previous application 2024/0214).

    Granted Householder Extension 8 docs
    Small domestic

In Barnsley

  • 2026/0562 Granted

    4 Hazelwood, Smithies, Barnsley, S71 2GE

    Erection of a single storey rear extension to dwelling (retrospective) and reduction in rear garden ground level.

    Received 9 Jul, published by the council 14 Aug 2026 Householder
  • 2026/0389 Granted

    16 Melvinia Crescent, Barnsley, S75 1DZ

    Erection of single storey rear extension to dwelling.

    Received 18 May, published by the council 21 Jul 2026 Householder
  • 2026/0139 Granted

    44 Bar Lane, Staincross, Barnsley, S75 6DF

    Removal of existing single storey rear extension and detached single garage, and erection of front and rear extensions, raising of roof to enable loft conversion, and install balcony to rear of dwelling

    Received 20 Feb, published by the council 21 Jul 2026 Householder
  • 2026/0522 Granted

    188 Pogmoor Road, Pogmoor, Barnsley, S75 2LA

    Removal of 2no chimney stacks, removal and blocking up of 4no windows, demolition of existing detached garage, extension of hard surfacing, installation of external insulated render and erection of a single storey rear extension.

    Received 26 Jun, published by the council 21 Jul 2026 Householder
  • 2026/0414 Granted

    157 Redbrook Road, Gawber, Barnsley, S75 2RA

    Erection of a two storey rear extension and creation of an access onto a classified road

    Received 22 May, published by the council 23 Jul 2026 Householder