Skip to content
PlanIndex Get alerts
Menu

Planning application

3 - 7 The Broadway London NW7 3LN

Awaiting decision Barnet 26/3170/FUL Full applications

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Replacement of mechanical plant with 1no. three fan gas cooler and 1no. external condenser

As published by the council, reference 26/3170/FUL

Application record

Reference
26/3170/FUL
Category
Full applications
Status
Pending Consideration
Received
28 Aug 2026
Validated
2 Sep 2026
Postcode
NW7 3LN

Timeline

Dates from the published record

  1. 28 Aug 2026

    Received by Barnet

  2. 2 Sep 2026

    Validated

    Checked as complete and ready for consideration.

  3. 5 Sep 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 28 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Barnet took a median of 42 days over the applications it decided in the last year.

What happens while it is decided

The process from here

This application is with Barnet for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 3 Millway London NW7 3QR

    25/3630/192 Submitted 3 Sep 2025 28m away

    79% historically approved · decision due ~29 Oct

    Single storey rear extension

    Awaiting decision Lawful development Extension 3 docs
    Small domestic
  • 21A The Broadway London NW7 3DA

    25/4548/FUL Submitted 14 Nov 2025 35m away

    61% historically approved · decision due ~15 Jan

    Conversion of existing second and third floor maisonette into 3no. self-contained flats with, A two storey rear extension at first and second floor levels including enclosure of first floor courtyard; Roof extension including 3no. side facing dormers and 2no. rooflights to side roofslope

    Awaiting decision Full applications New dwelling Extension +1 26 docs
  • 12 The Broadway London NW7 3LL

    25/3875/FUL Submitted 22 Sep 2025 54m away

    61% historically approved · decision due ~21 Nov

    Conversion of existing first and second floor residential unit into 2no. self-contained flats including: Two storey rear extension at first and second floor levels. Alterations and extensions to roof including 1no. front dormer window and 1no. rear dormer window. New access staircase and elevated decking to rear elevation. Demolition of existing detached garage at rear. Provision of associated amenity space, refuse storage, cycle storage and new fence and gates to rear boundary

    Awaiting decision Full applications New dwelling Extension +3 10 docs
    Small domestic
  • 6 Millway London NW7 3RE

    25/3996/192 Submitted 2 Oct 2025 64m away

    79% historically approved · decision due ~2 Dec

    Roof extension including 1no. side dormer window, 1no. rear dormer window and 2no. rooflights to front roofslope. Insertion of new fold-back sliding patio doors to ground floor rear elevation

    Awaiting decision Lawful development Extension Loft or dormer +1 4 docs
  • 17 Millway London NW7 3QR

    25/3360/HSE Submitted 12 Aug 2025 89m away

    Single storey rear extension with 1no. roof lantern following demolition of the existing conservatory. Roof extension involving hip to gable, rear dormer window with juliette balcony. Changes to fenestration

    Granted Householder Extension Loft or dormer +2 6 docs
    Small domestic
  • 19 Millway London NW7 3QR

    25/4039/FUL Submitted 6 Oct 2025 96m away

    61% historically approved · decision due ~2 Dec

    Conversion of the existing dwelling into 2no. self-contained flats including retention of the first floor rear extension and front porch extension. Associated amenity space, cycle and refuse and recycling storage

    Awaiting decision Full applications New dwelling Extension 9 docs
    Small domestic

In Barnet

  • 26/3199/FUL Awaiting decision

    494 Finchley Road London NW11 8DE

    Demolition of the existing dwelling and erection of a two storey building over basement car park with rooms in the roofspace to provide 6no. self-contained residential dwellings. Associated amenity space, cycle stores and refuse/recycling storage

    1 Sep 2026 Full applications
  • 26/3200/FUL Awaiting decision

    289 Regents Park Road London N3 3JY

    Removal of front extension. Single storey side extension including new walls to replace existing boundary fences. (Part Retrospective)

    1 Sep 2026 Full applications
  • 26/3205/FUL Awaiting decision

    The Knoll Highwood Hill London NW7 4ET

    Demolition of the existing dwelling and erection of a new two storey dwelling with rooms in the roofspace. Associated bike storage

    1 Sep 2026 Full applications
  • 26/3204/FUL Awaiting decision

    136 Station Road London N3 2SG

    Conversion of existing property into 3no. self-contained flats including: Part single, part two storey rear extension; Roof extension including hip to gable with 1no. rear dormer window, 3no. front facing rooflights and 1no. gable window

    1 Sep 2026 Full applications
  • 26/3195/FUL Awaiting decision

    128 - 130 Woodfield Drive Barnet EN4 8PB

    Creation of new vehicle hardstanding and vehicular access to provide off-street parking, with associated retaining walls, steps, railings, landscaping and electric vehicle charging points to both properties. (Part Retrospective Application)

    1 Sep 2026 Full applications