Skip to content
PlanIndex Get alerts
Menu

Planning application

7 Audax Lower Strand London NW9 5LX

Awaiting decision Barnet 26/3135/RCU

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Change of use from a single dwellinghouse (Use Class C3) to a HMO (House in Multiple Occupation (Use Class C4) for up to 5 people (Retrospective Application)

As published by the council, reference 26/3135/RCU

Application record

Reference
26/3135/RCU
Status
Pending Consideration
Received
25 Aug 2026
Validated
26 Aug 2026
Postcode
NW9 5LX

Timeline

Dates from the published record

  1. 25 Aug 2026

    Received by Barnet

  2. 26 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 28 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 21 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Barnet took a median of 43 days over the applications it decided in the last year.

What happens while it is decided

This application is with Barnet for determination, against a statutory target of eight weeks. Over the last year Barnet's median decision took 43 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Barnet's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • 9 Cobham Great Strand London NW9 5NR

    26/2690/RCU Submitted 20 Jul 2026 114m away

    79% historically approved · decision due ~17 Sep

    Change of use from a single dwellinghouse (Use Class C3) to a 4 bed HMO (House in Multiple Occupation (Use Class C4). (Retrospective application) Proposed rear cycle storage area

    Awaiting decision
    Domestic
  • 2 Bristol Avenue London NW9 4EW

    26/0438/LIC Submitted 2 Feb 2026 158m away

    79% historically approved · decision due ~30 Mar

    Installation of 6no. antennas, 3no. equipment cabinets, and ancillary works thereto.

    Awaiting decision 2 docs
  • 2 Bristol Avenue London NW9 4EW

    26/0166/LIC Submitted 14 Jan 2026 158m away

    79% historically approved · decision due ~11 Mar

    Installation of 6no. antennas, 3no. equipment cabinets, and ancillary works thereto

    Awaiting decision
  • Barnet & Southgate College 7 Bristol Avenue London NW9 4BR

    26/0591/FUL Submitted 16 Feb 2026 216m away

    Installation of an Air source heat pump system to the north east side flat roof

    Granted Full applications 10 docs
  • Royal Air Force Museum Grahame Park Way London NW9 5LL

    26/1476/LBC Submitted 21 Apr 2026 341m away

    79% historically approved · decision due ~30 Jun

    Installation of 2no. air source heat pumps (ASHPs) and 2no. water source heat pumps (WSHPs) in the boiler house area to the north of the site with associated removal of redundant services, and other associated works to retrofit the boiler house including, new metal mesh fencing around ASHPs, partial removal of cladding to south side, replacement of doors and frames, creation of new opening in east and south elevations, replacement of roof covering, new external lighting above external doors and to the new mesh fencing, acoustic enclosures around ASHPs. Installation of 3no. louvres to the existing colonnade building. New UKPN termination box enclosure (Amendment to 25/0864/LBC)

    Awaiting decision Heritage and listed buildings Roofing 20 docs
  • Royal Air Force Museum Grahame Park Way London NW9 5LL

    26/1579/S73 Submitted 27 Apr 2026 352m away

    95% historically approved · decision due ~30 Jun

    Variation of condition 1 (Approved Plans) of planning permission reference 25/0863/FUL dated 29/04/25 for 'Installation of 2no. air source heat pumps (ASHPs) and 2no. water source heat pumps (WSHPs) in the boiler house area to the north of the site with associated removal of redundant services, and other associated works to retrofit the boiler house including, new metal mesh fencing around ASHPs, partial removal of cladding to south side, replacement of doors and frames, creation of new opening in east and south elevations, replacement of roof covering, new external lighting above external doors and to the new mesh fencing, acoustic enclosures around ASHPs. Installation of 3no. louvres to the existing colonnade building.' Variation to include changes to the ASHPs and associated fencing and lighting. Alterations to doors. Addition of an enclosure to house UKPN termination box

    Awaiting decision Conditions Roofing 21 docs