Skip to content
PlanIndex Get alerts
Menu

Planning application

4 Monterey Close London NW7 3DD

Awaiting decision Barnet 26/2766/FUL Full applications

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Change of use from C3 (Residential) to short term let (amended description)

As published by the council, reference 26/2766/FUL

Application record

Reference
26/2766/FUL
Category
Full applications
Status
Pending Consideration
Received
27 Jul 2026
Validated
11 Aug 2026
Postcode
NW7 3DD

Timeline

Dates from the published record

  1. 27 Jul 2026

    Received by Barnet

  2. 11 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 11 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 6 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Barnet took a median of 42 days over the applications it decided in the last year.

What happens while it is decided

The process from here

This application is with Barnet for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 55 The Broadway London NW7 3DA

    25/3999/FUL Submitted 2 Oct 2025 34m away

    61% historically approved · decision due ~27 Nov

    Installation of 7no. air condenser units to rear with acoustic screen

    Awaiting decision Full applications 13 docs
  • 55 The Broadway London NW7 3DA

    25/3439/S73 Submitted 18 Aug 2025 34m away

    Variation of condition 1 (Approved plans) 3 (Materials) 21 (Windows) pursuant to planning permission 24/3091/FUL dated 23/07/2025 for `Conversion of existing first floor office space and second floor flat into 4no. self-contained flats. Partial demolition of rear attached structure. Two storey rear extension at first and second floor levels. First floor extension to existing rear ground floor building and partial conversion of ground floor to create 1no new dwelling with PV panels. Associated amenity space, refuse storage and cycle stores)` Amendments to brickwork material and replacement of existing windows

    Granted Conditions New dwelling Extension +2 7 docs
    Domestic
  • 55 The Broadway London NW7 3DA

    25/4789/CON Submitted 1 Dec 2025 37m away

    95% historically approved · decision due ~26 Jan

    Submission of details of condition 4 (Demolition and Construction Management and Logistics Plan) 5 (Refuse and Recycling) 6 (Cycle Parking and Storage) 7 (Hard and soft landscaping) 8 (Tree Protection & Method Statement) 9 (Subdivision of Amenity Space) 13 (Solar Panels) 16 (Air pollution Mitigation) 17 (Noise Mitigation-Traffic) 19 (Noise mitigation-Ventilation) 20 (Means of Enclosure) pursuant to planning permission 25/3439/S73 dated 07/11/2025

    Awaiting decision Conditions Demolition Trees 8 docs
  • 19 Goodwyn Avenue London NW7 3RJ

    26/1648/FUL Submitted 1 May 2026 47m away

    Single storey rear infill extension with 2no. rooflights

    Granted Full applications Extension Loft or dormer 6 docs
    Small domestic
  • 21 Goodwyn Avenue London NW7 3RJ

    26/0845/192 Submitted 5 Mar 2026 52m away

    79% historically approved · decision due ~30 Apr

    Roof extension involving hip to gable, rear dormer window and 3no. front facing rooflights

    Awaiting decision Lawful development Extension Loft or dormer +1 19 docs
  • 63 The Broadway London NW7 3DA

    26/1931/RCU Submitted 22 May 2026 60m away

    Installation of a retractable canopy above the seating rear yard associated with window installation. (Retrospective Application)

    Granted Amendments Windows or glazing 8 docs

In Barnet

  • 26/3199/FUL Awaiting decision

    494 Finchley Road London NW11 8DE

    Demolition of the existing dwelling and erection of a two storey building over basement car park with rooms in the roofspace to provide 6no. self-contained residential dwellings. Associated amenity space, cycle stores and refuse/recycling storage

    1 Sep 2026 Full applications
  • 26/3200/FUL Awaiting decision

    289 Regents Park Road London N3 3JY

    Removal of front extension. Single storey side extension including new walls to replace existing boundary fences. (Part Retrospective)

    1 Sep 2026 Full applications
  • 26/3205/FUL Awaiting decision

    The Knoll Highwood Hill London NW7 4ET

    Demolition of the existing dwelling and erection of a new two storey dwelling with rooms in the roofspace. Associated bike storage

    1 Sep 2026 Full applications
  • 26/3204/FUL Awaiting decision

    136 Station Road London N3 2SG

    Conversion of existing property into 3no. self-contained flats including: Part single, part two storey rear extension; Roof extension including hip to gable with 1no. rear dormer window, 3no. front facing rooflights and 1no. gable window

    1 Sep 2026 Full applications
  • 26/3195/FUL Awaiting decision

    128 - 130 Woodfield Drive Barnet EN4 8PB

    Creation of new vehicle hardstanding and vehicular access to provide off-street parking, with associated retaining walls, steps, railings, landscaping and electric vehicle charging points to both properties. (Part Retrospective Application)

    1 Sep 2026 Full applications